PCG, §1A diff (2016 → 2017)
Added paragraphs (14442 words)
ITEM 1A. RISK FACTORS PG&E Corporation’s and the Utility’s financial results can be affected by many factors, including estimates and assumptions used in the critical accounting policies described in MD&A, that can cause their actual financial results to differ materially from historical results or from anticipated future financial results. The following discussion of key risk factors should be considered in evaluating an investment in PG&E Corporation and the Utility and should be read in conjunction with MD&A and the Consolidated Financial Statements and related Notes in Part II, Item 8, “Financial Statements and Supplementary Data” of this Form 10-K. Any of these factors, in whole or in part, could materially affect PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, cash flows, and stock price. Risks Related to Wildfires PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by potential losses resulting from the impact of the Northern California wildfires. PG&E Corporation and the Utility also expect to be the subject of additional lawsuits and could be the subject of additional investigations, citations, fines or enforcement actions. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by potential losses resulting from the impact of the multiple wildfires that spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Del Norte, Lake, Nevada, and Yuba Counties, as well as in the area surrounding Yuba City, beginning on October 8, 2017 (the “Northern California wildfires”). According to the Cal Fire California Statewide Fire Summary dated October 30, 2017, at the peak of the wildfires, there were 21 major wildfires in California that, in total, burned over 245,000 acres, resulted in 43 fatalities, and destroyed an estimated 8,900 structures. Subsequently, the number of fatalities increased to 44. The Utility incurred $219 million in costs for service restoration and repair to the Utility’s facilities (including $97 million in capital expenditures) through December 31, 2017 in connection with these fires. While the Utility believes that such costs are recoverable through CEMA, its CEMA requests are subject to CPUC approval. The Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility is unable to recover such costs. The fires are being investigated by Cal Fire and the CPUC, including the possible role of the Utility’s power lines and other facilities. The Utility expects that Cal Fire will issue a report or reports stating its conclusions as to the sources of ignition of the fires and the ways that they progressed. The CPUC’s SED also is conducting investigations to assess the compliance of electric and communication companies’ facilities with applicable rules and regulations in fire impacted areas. According to information made available by the CPUC, investigation topics include, but are not limited to, maintenance of facilities, vegetation management, and emergency preparedness and response. Various other entities, including fire departments, may also be investigating certain of the fires. (For example, on February 3, 2018, it was reported that investigators with the Santa Rosa Fire Department had completed their investigation of two small fires that reportedly destroyed two homes and damaged one outbuilding and had concluded that the Utility’s facilities, along with high wind and other factors, contributed to those fires.) It is uncertain when the investigations will be complete and whether Cal Fire will release any preliminary findings before its investigation is complete. As of January 31, 2018, the Utility had submitted 22 electric incident reports to the CPUC associated with the Northern California wildfires where Cal Fire has identified a site as potentially involving the Utility’s facilities in its investigation and the property damage associated with each incident exceeded $50,000. The information contained in these reports is factual and preliminary, and does not reflect a determination of the causes of the fires. The investigations into the fires are ongoing. If the Utility’s facilities, such as its electric distribution and transmission lines, are determined to be the cause of one or more fires, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, interest, and attorneys’ fees without having been found negligent, which liability, in the aggregate, could be substantial and have a material adverse effect on PG&E Corporation and the Utility. (See “The doctrine of inverse condemnation, if applied by courts in litigation to which PG&E Corporation or the Utility are subject, could significantly expand the potential liabilities from such litigation and materially negatively affect PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows” below.) In addition to such claims for property damage, interest and attorneys’ fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, and other damages under other theories of liability, including if the Utility were found to have been negligent, which liability, in the aggregate, could be substantial and have a material adverse effect on PG&E Corporation and the Utility. Further, the Utility could be subject to material fines or penalties if the CPUC or any other law enforcement agency brought an enforcement action and determined that the Utility failed to comply with applicable laws and regulations. Given the preliminary stages of investigations and the uncertainty as to the causes of the fires, PG&E Corporation and the Utility do not believe a loss is probable at this time. However, it is reasonably possible that facts could emerge through the course of the various investigations that lead PG&E Corporation and the Utility to believe that a loss is probable, resulting in an accrued liability in the future, the amount of which could be material. PG&E Corporation and the Utility currently are unable to reasonably estimate the amount of losses (or range of amounts) that they could incur, given the preliminary stages of the investigations and the uncertainty regarding the extent and magnitude of potential damages. On January 31, 2018, the California Department of Insurance issued a press release announcing an update on property losses in connection with the October and December wildfires in California, stating that, as of such date, “insurers have received nearly 45,000 insurance claims totaling more than $11.79 billion in losses,” of which approximately $10 billion relates to statewide claims from the October 2017 wildfires. The remaining amount relates to claims from the Southern California December 2017 wildfires. According to the California Department of Insurance, as of the date of the press release, more than 21,000 homes, 3,200 businesses, and more than 6,100 vehicles, watercraft, farm vehicles, and other equipment were damaged or destroyed by the October 2017 wildfires. PG&E Corporation and the Utility have not independently verified these estimates. The California Department of Insurance did not state in its press release whether it intends to provide updated estimates of losses in the future. If the Utility’s facilities are determined to be the cause of one or more of the Northern California wildfires, PG&E Corporation and the Utility could be liable for the related property losses and other damages. The California Department of Insurance January 31, 2018 press release reflects insured property losses only. The press release does not account for uninsured losses, interest, attorneys’ fees, fire suppression costs, evacuation costs, medical expenses, personal injury and wrongful death damages or other costs. If the Utility were to be found liable for certain or all of such other costs and expenses, the amount of PG&E Corporation’s and the Utility’s liability could be higher than the approximately $10 billion estimated in respect of the wildfires that occurred in October 2017, depending on the extent of the damage in connection with such fire or fires. As a result, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. PG&E Corporation and the Utility also are the subject of a still increasing number of lawsuits that have been filed against PG&E Corporation and the Utility in Sonoma, Napa and San Francisco Counties’ Superior Courts, several of which seek to be certified as class actions. The lawsuits allege, among other things, negligence, inverse condemnation, trespass, and private nuisance. They principally assert that PG&E Corporation’s and the Utility’s alleged failure to maintain and repair their distribution and transmission lines and failure to properly maintain the vegetation surrounding such lines were the causes of the fires. The plaintiffs seek damages that include wrongful death, personal injury, property damage, evacuation costs, medical expenses, punitive damages, attorneys’ fees, and other damages. In addition, two derivative lawsuits for breach of fiduciary duties and unjust enrichment were filed in the San Francisco County Superior Court on November 16, 2017 and November 20, 2017, respectively. PG&E Corporation and the Utility expect to be the subject of additional lawsuits in connection with the Northern California wildfires. The wildfire litigation could take a number of years to be resolved because of the complexity of the matters, including the ongoing investigation into the causes of the fires and the growing number of parties and claims involved. The Utility has liability insurance from various insurers, which provides coverage for third-party liability attributable to the Northern California wildfires in an aggregate amount of approximately $800 million. If the Utility were to be found liable for one or more fires, the Utility’s insurance could be insufficient to cover that liability, depending on the extent of the damage in connection with such fire or fires. In addition, it could take a number of years before the Utility’s final liability is known and the Utility could apply for cost recovery. The Utility may be unable to recover costs in excess of insurance through regulatory mechanisms and, even if such recovery is possible, it could take a number of years to resolve and a number of years thereafter to collect. Further, SB 819, introduced in the California Senate in January 2018, if it becomes law, would prohibit utilities from recovering costs in excess of insurance resulting from damages caused by such utilities’ facilities, if the CPUC determines that the utility did not reasonably construct, maintain, manage, control, or operate the facilities. PG&E Corporation and the Utility have considered certain actions that might be taken to attempt to address liquidity needs of the business in such circumstances, but the inability to recover costs in excess of insurance through increases in rates and by collecting such rates in a timely manner, or any negative assessment by the Utility of the likelihood or timeliness of such recovery and collection, could have a material adverse effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. (See “If the Utility is unable to recover all or a significant portion of its excess costs in connection with the Northern California wildfires and the Butte fire through ratemaking mechanisms, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected” below.) Losses in connection with the wildfires would likely require PG&E Corporation and the Utility to seek financing, which may not be available on terms acceptable to PG&E Corporation or the Utility, or at all, when required. (See “Risks Related to Liquidity and Capital Requirements” below.) As of December 31, 2017, neither PG&E Corporation nor the Utility has accrued a liability with respect to the Northern California wildfires. If PG&E Corporation and the Utility were to determine that it is both probable that a loss has occurred and the amount of loss can be reasonably estimated, a liability would be recorded consistent with applicable accounting principles and as described in Note 13 of the Notes to the Consolidated Financial Statements in Item 8. As noted above, to the extent that such determination is made and a liability is accrued with respect to the Northern California wildfires, the amount of such liability accrual may be substantial. To the extent not offset by insurance recoveries determined to be similarly probable and estimable, the liability would reduce the balance sheet equity of PG&E Corporation and the Utility, which could adversely impact the Utility’s ability to maintain its CPUC-authorized capital structure of 52% equity and 48% debt and preferred stock, and which could also adversely impact PG&E Corporation’s and the Utility’s credit ratings and their ability to declare and pay dividends, efficiently raise capital, comply with financial covenants, and meet financial obligations. (See “PG&E Corporation’s and the Utility’s financial results will be affected by their ability to continue accessing the capital markets and by the terms of debt and equity financings” below.) Uncertainties relating to and market perception of these matters and the disclosure of findings regarding these matters over time, also could continue or increase volatility in the market for PG&E Corporation’s common stock and other securities, and for the securities of the Utility, and materially affect the price of such securities. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by the ultimate amount of third-party liability that the Utility incurs in connection with the Butte fire. In September 2015, a wildfire (known as the “Butte fire”) ignited and spread in Amador and Calaveras Counties in Northern California. On April 28, 2016, Cal Fire released its report of the investigation of the origin and cause of the wildfire. According to Cal Fire’s report, the fire burned 70,868 acres, resulted in two fatalities, destroyed 549 homes, 368 outbuildings and four commercial properties, and damaged 44 structures. Cal Fire’s report concluded that the wildfire was caused when a gray pine tree contacted the Utility’s electric line which ignited portions of the tree, and determined that the failure by the Utility and/or its vegetation management contractors, ACRT Inc. and Trees, Inc., to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree. In connection with the Butte fire, complaints have been filed against the Utility, currently involving approximately 3,770 individual plaintiffs representing approximately 2,030 households and their insurance companies. Plaintiffs seek to recover damages and other costs, principally based on the doctrine of inverse condemnation and negligence theory of liability. Plaintiffs also seek punitive damages. The number of individual complaints and plaintiffs may still increase in the future, because the statute of limitations for property damages in connection with the Butte fire has not yet expired. (The statute of limitations for personal injury in connection with the Butte fire has expired.) The Utility continues mediating and settling cases. In addition, on April 13, 2017, Cal Fire filed a complaint seeking to recover $87 million for its costs incurred in connection with the Butte fire, and in May 2017, the OES indicated that it intends to bring a claim against the Utility that the OES estimated in the approximate amount of $190 million. Also, in June 2017, the County of Calaveras indicated that it intends to bring a claim against the Utility that it estimates in the approximate amount of $85 million. In connection with this matter, the Utility may be liable for property damages, interest, and attorneys’ fees without having been found negligent, through the doctrine of inverse condemnation. In addition, the Utility may be liable for fire suppression costs, personal injury damages, and other damages if the Utility were found to have been negligent. While the Utility believes it was not negligent, there can be no assurance that a court or jury would agree with the Utility. The Utility currently believes that it is probable that it will incur a loss of at least $1.1 billion, increased from the $750 million previously estimated as of December 31, 2016 in connection with the Butte fire. While this amount includes the Utility’s assumptions about fire suppression costs (including its assessment of the Cal Fire loss), it does not include any significant portion of the estimated claims from the OES and the County of Calaveras. The Utility still does not have sufficient information to reasonably estimate the probable loss it may have for these additional claims. A change in management’s estimates or assumptions could result in an adjustment that could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. (See Note 13 to the Consolidated Financial Statements in Item 8.) If the Utility is unable to recover all or a significant portion of its excess costs in connection with the Northern California wildfires and the Butte Fire through ratemaking mechanisms, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Through December 31, 2017, the amounts accrued in connection with claims relating to the Butte fire have exceeded the Utility’s liability insurance coverage. While the Utility filed an application with the CPUC requesting approval to establish a WEMA to track wildfire expenses and to preserve the opportunity for the Utility to request recovery of wildfire costs that have not otherwise been recovered through insurance or other mechanisms, the Utility cannot predict the outcome of this proceeding. (See “Regulatory Matters - Application to Establish a Wildfire Expense Memorandum Account” in Item 7. MD&A.) In addition, there can be no assurance that the Utility will be allowed to recover costs recorded in WEMA, if approved, in the future. While the CPUC previously approved WEMA tracking accounts for San Diego Gas & Electric Company in 2010, in December 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it incurred as a result of the doctrine of inverse condemnation, holding that the inverse condemnation principles of strict liability are not relevant to the CPUC’s prudent manager standard. That determination is being challenged by San Diego Gas & Electric as well as by the Utility and Southern California Edison. Additionally, SB 819 introduced in the California Senate in January 2018, if it becomes law, would prohibit utilities’ recovery of costs in excess of insurance resulting from damages caused by such utilities’ facilities, if the CPUC determines that the Utility did not reasonably construct, maintain, manage, control, or operate the facilities. PG&E Corporation and the Utility have considered certain actions that might be taken to attempt to address liquidity needs of the business in such circumstances, but the inability to recover all or a significant portion of costs in excess of insurance through increases in rates and by collecting such rates in a timely manner, or any negative assessment by the Utility of the likelihood or timeliness of such recovery and collection, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The doctrine of inverse condemnation, if applied by courts in litigation to which PG&E Corporation or the Utility are subject, could significantly expand the potential liabilities from such litigation and materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. California law includes a doctrine of inverse condemnation that is routinely invoked in California for wildfire damages. Inverse condemnation imposes strict liability (including liability for attorneys’ fees) for damages as a result of the design, construction and maintenance of utility facilities, including utilities’ electric transmission lines. Courts have imposed liability under the doctrine of inverse condemnation in legal actions brought by property holders against utilities on the grounds that losses borne by the person whose property was damaged through a public use undertaking should be spread across the community that benefitted from such undertaking, and based on the assumption that utilities have the ability to recover these costs from their customers. Plaintiffs have asserted the doctrine of inverse condemnation in lawsuits related to the Northern California and Butte fires, and it is possible that plaintiffs could be successful in convincing courts to apply this doctrine in these or other litigations. For example, on June 22, 2017, the Superior Court for the County of Sacramento found that the doctrine of inverse condemnation applies to the Utility with respect to the Butte fire. Although the Utility has filed a renewed motion for a legal determination of inverse condemnation liability, there can be no assurance that the Utility will be successful in its arguments that the doctrine of inverse condemnation does not apply in the Butte fire or other litigation against PG&E Corporation or the Utility. Furthermore, a court could determine that the doctrine of inverse condemnation applies even in the absence of an open CPUC proceeding for cost recovery, or before a potential cost recovery decision is issued by the CPUC. Although the imposition of liability is premised on the assumption that utilities have the ability to automatically recover these costs from their customers, there can be no guarantee that the CPUC would authorize cost recovery whether or not a previous court decision imposes liability on a utility under the doctrine of inverse condemnation. In December 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it incurred as a result of the doctrine of inverse condemnation, holding that the inverse condemnation principles of strict liability are not relevant to the CPUC’s prudent manager standard. That determination is being challenged by San Diego Gas & Electric as well as by the Utility and Southern California Edison. If PG&E Corporation or the Utility were to be found liable for damage under the doctrine of inverse condemnation, but is unable to secure a cost recovery decision from the CPUC to pay for such costs through increases in rates, the financial condition, results of operations, liquidity and cash flows of PG&E Corporation and the Utility would be materially affected by potential losses resulting from the impact of the Northern California wildfires. (See “PG&E Corporation and the Utility also expect to be the subject of additional lawsuits and could be the subject of additional investigations, citations, fines or enforcement actions” and “PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected by the ultimate amount of third-party liability that the Utility incurs in connection with the Butte fire” above.) Risks Related to the Outcome of Other Enforcement Matters, Investigations, and Regulatory Proceedings The Utility is subject to extensive regulations and the risk of enforcement proceedings in connection with such regulations, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by the outcomes of the CPUC’s investigative enforcement proceedings against the Utility, other known enforcement matters, and other ongoing state and federal investigations and requests for information. The Utility could incur material costs and fines in connection with compliance with penalties from closed investigations or enforcement actions or in connection with future investigations, citations, audits, or enforcement actions. The Utility is subject to extensive regulations, including federal, state and local energy, environmental and other laws and regulations, and the risk of enforcement proceedings in connection with such regulations. The Utility could incur material charges, including fines and other penalties, in connection with the ex parte OII, safety culture OII, and the CPUC’s SED investigations, including the SED’s investigations of the Yuba City incident, which arose from a residential structure fire in Yuba City, California, in January 2017, that resulted in the collapse of a house and injuries to two persons inside the house, or other current and future investigations. The SED could launch investigations at any time on any issue it deems appropriate. The SED has discretion whether to issue a penalty for each violation, but if it assesses a penalty for a violation, it is required to impose the maximum statutory penalty of $50,000, with an administrative limit of $8 million per citation issued. The SED may, at its discretion, impose penalties on a daily basis, or on less than a daily basis, for violations that continued for more than one day. The SED also has wide discretion to determine the amount of penalties based on the totality of the circumstances, including such factors as the gravity of the violations; the type of harm caused by the violations and the number of persons affected; and the good faith of the entity charged in attempting to achieve compliance, after notification of a violation. The SED also is required to consider the appropriateness of the amount of the penalty to the size of the entity charged. Historically, the SED has exercised broad discretion in determining whether violations are continuing and the amount of penalties to be imposed. While it is uncertain how the CPUC will calculate the number of violations or the penalty for any violations, such fines or penalties could be significant and materially affect PG&E Corporation’s and the Utility’s liquidity and results of operations. (See Note 13 to the Consolidated Financial Statements in Item 8.) The Utility also is a target of a number of investigations. In 2014, both the U.S. Attorney's Office in San Francisco and the California Attorney General's office opened investigations into matters related to allegedly improper communication between the Utility and CPUC personnel. The Utility also is unable to predict the outcome of, or costs and expenses associate with, pending investigations, including whether any charges will be brought against the Utility. If these investigations result in enforcement action against the Utility, the Utility could incur additional fines or penalties and, in the event of a judgment against the Utility, suffer further ongoing negative consequences. For example, on April 9, 2015, the CPUC issued a decision in its investigative enforcement proceedings against the Utility to impose total penalties of $1.6 billion on the Utility after determining that the Utility had committed numerous violations of laws and regulations related to its natural gas transmission operations (the “San Bruno Penalty Decision”). The San Bruno Penalty Decision requires the SED to review the Utility’s gas transmission operations (including the Utility’s compliance with the remedies ordered by the San Bruno Penalty Decision) and to perform annual audits of the Utility’s record-keeping practices for a minimum of ten years. The SED could impose fines on the Utility or require the Utility to incur unrecoverable costs, or both, based on the outcome of these future audits. Furthermore, a negative outcome in any of these investigations, or future enforcement actions, could negatively affect the outcome of future ratemaking and regulatory proceedings to which the Utility may be subject; for example, by enabling parties to challenge the Utility’s request to recover costs that the parties allege are somehow related to the Utility’s violations. (See also “PG&E Corporation’s and the Utility’s future financial results could be materially affected by the conviction of the Utility in the federal criminal proceeding and by the debarment proceeding” below.) The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and resource adequacy requirements; customer billing; customer service; affiliate transactions; vegetation management; design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC general orders or other applicable CPUC decisions or regulations; federal electric reliability standards; and environmental compliance. For example, despite the Utility’s system-wide survey of its transmission pipelines, carried out in an effort to address a self-reported violation whereby the Utility did not properly identify encroachments (such as building structures and vegetation overgrowth) on the Utility’s pipeline rights-of-way, the SED could impose fines on the Utility in the future based on the Utility’s failure to continuously survey its system and remove encroachments. CPUC staff could also impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected in the event of non-compliance with the terms of probation and by the outcome of the debarment proceeding. On August 9, 2016, the jury in the federal criminal trial against the Utility in the United States District Court for the Northern District of California, in San Francisco, found the Utility guilty on one count of obstructing a federal agency proceeding and five counts of violations of pipeline integrity management regulations of the Natural Gas Pipeline Safety Act. On January 26, 2017, the court issued a judgment of conviction against the Utility. The court sentenced the Utility to a five-year corporate probation period, oversight by a third-party monitor for a period of five years, with the ability to apply for early termination after three years, a fine of $3 million to be paid to the federal government, certain advertising requirements, and community service. The probation includes a requirement that the Utility not commit any local, state, or federal crimes during the probation period. As part of the probation, the Utility has retained a third-party monitor at the Utility’s expense. The goal of the monitor is to help ensure that the Utility takes reasonable and appropriate steps to maintain the safety of its gas and electric operations, and to maintain effective ethics, compliance and safety related incentive programs on a Utility-wide basis. The Utility could incur material costs and additional penalties, not recoverable through rates, in the event of non-compliance with the terms of its probation and in connection with the monitorship (including but not limited to costs resulting from recommendations of the monitor). Since 2015, the Utility has also been the subject of a DOI inquiry into whether the Utility should be suspended or debarred from entering into federal procurement and non-procurement contracts and programs, citing the San Bruno explosion, and indicating, as the basis for the inquiry, alleged poor record-keeping, poor identification and evaluation of threats to gas lines and obstruction of the NTSB’s investigation. On December 21, 2016, the Utility and the DOI entered into an interim administrative agreement that reflects the DOI’s determination that the Utility remains eligible to contract with federal government agencies while the DOI determines whether any further action is necessary to protect the federal government’s business interests. If the DOI determines that the Utility’s compliance and ethics program is not generally effective in preventing and detecting criminal conduct, the Utility may be required to enter into an amended administrative agreement and implement remedial and other measures, such as a requirement that the Utility’s natural gas operations and/or compliance and ethics programs be supervised by one or more independent third-party monitor(s). The Utility’s conviction and the outcome of probation and the debarment proceeding could harm the Utility’s relationships with regulators, legislators, communities, business partners, or other constituencies and make it more difficult to recruit qualified personnel and senior management. Further, they could negatively affect the outcome of future ratemaking and regulatory proceedings, for example, by enabling parties to argue that the Utility should not be allowed to recover costs that the parties allege are somehow related to the criminal charges on which the Utility was found guilty. They could also result in increased regulatory or legislative scrutiny with respect to various aspects of how the Utility’s business is conducted or organized. (See “Enforcement and Litigation Matters” in Item 7. MD&A.) PG&E Corporation’s and the Utility’s financial results primarily depend on the outcomes of regulatory and ratemaking proceedings and the Utility’s ability to manage its operating expenses and capital expenditures so that it is able to earn its authorized rate of return in a timely manner. As a regulated entity, the Utility’s rates are set by the CPUC or the FERC on a prospective basis and are generally designed to allow the Utility to collect sufficient revenues to recover reasonable costs of providing service, including a return on its capital investments. PG&E Corporation’s and the Utility’s financial results could be materially affected if the CPUC or the FERC does not authorize sufficient revenues for the Utility to safely and reliably serve its customers and earn its authorized ROE. The outcome of the Utility’s ratemaking proceedings can be affected by many factors, including the level of opposition by intervening parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of the Utility’s regulators, consumer and other stakeholder organizations, and customers, about the Utility’s ability to provide safe, reliable, and affordable electric and gas services. Further, the increasing amount of Reliability Must Run (“RMR”) electric generation in the CAISO could increase the Utility’s costs of procuring capacity needed for reliable service to its customers. In addition to the amount of authorized revenues, PG&E Corporation’s and the Utility’s financial results could be materially affected if the Utility’s actual costs to safely and reliably serve its customers differ from authorized or forecast costs. The Utility may incur additional costs for many reasons including changing market circumstances, unanticipated events (such as storms, fires, accidents, or catastrophic or other events affecting the Utility’s operations), or compliance with new state laws or policies. Although the Utility may be allowed to recover some or all of the additional costs, there may be a substantial time lag between when the Utility incurs the costs and when the Utility is authorized to collect revenues to recover such costs. Alternatively, the CPUC or the FERC may disallow costs that they determine were not reasonably or prudently incurred by the Utility. The Utility also is required to incur costs to comply with legislative and regulatory requirements and initiatives, such as those relating to the development of a state-wide electric vehicle charging infrastructure, the deployment of distributed energy resources, implementation of demand response and customer energy efficiency programs, energy storage and renewable energy targets, underground gas storage, and the construction of the California high-speed rail project. The Utility’s ability to recover costs, including its investments, associated with these and other legislative and regulatory initiatives will, in large part, depend on the final form of legislative or regulatory requirements, and whether the associated ratemaking mechanisms can be timely adjusted to reflect a lower customer demand for the Utility’s electricity and natural gas services. PG&E Corporation’s and the Utility’s financial results depend upon the Utility’s continuing ability to recover “pass-through” costs, including electricity and natural gas procurement costs, from customers in a timely manner. The CPUC may disallow procurement costs for a variety of reasons. In addition, the Utility’s ability to recover these costs could be affected by the loss of Utility customers and decreased new customer growth, if the CPUC fails to adjust the Utility’s rates to reflect such events. The Utility meets customer demand for electricity from a variety of sources, including electricity generated from the Utility’s own generation facilities, electricity provided by third parties under power purchase agreements, and purchases on the wholesale electricity market. The Utility must manage these sources using the commercial and CPUC regulatory principles of “least cost dispatch” and prudent administration of power purchase agreements in compliance with its CPUC-approved long-term procurement plan. The CPUC could disallow procurement costs incurred by the Utility if the CPUC determines that the Utility did not comply with these principles or if the Utility did not comply with its procurement plan. Further, the contractual prices for electricity under the Utility’s current or future power purchase agreements could become uneconomic in the future for a variety of reasons, including developments in alternative energy technology, increased self-generation by customers, an increase in distributed generation, and lower customer demand due to adverse economic conditions or the loss of the Utility’s customers to other retail providers. In particular, the Utility will incur additional costs to procure renewable energy to meet the higher targets established by California SB 350 that became effective on January 1, 2016. Despite the CPUC’s current approval of the contracts, the CPUC could disallow contract costs in the future if it determines that the terms of such contracts, including price, do not meet the CPUC reasonableness standard. The Utility’s ability to recover the costs it incurs in the wholesale electricity market may be affected by whether the CAISO wholesale electricity market continues to function effectively. Although market mechanisms are designed to limit excessive prices, these market mechanisms could fail, or the related systems and software on which the market mechanisms rely may not perform as intended which could result in excessive market prices. The CPUC could prohibit the Utility from passing through the higher costs of electricity to customers. For example, during the 2000 and 2001 energy crisis, the market mechanism flaws in California’s then-newly established wholesale electricity market led to dramatically high market prices for electricity that the Utility was unable to recover through customer rates, ultimately causing the Utility to file a petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code. Further, PG&E Corporation’s and the Utility’s financial results could be affected by the loss of Utility customers and decreasing bundled load that occurs through municipalization of the Utility’s facilities, an increase in the number of CCAs who provide electricity to their residents, and an increase in the number of consumers who become direct access customers of alternative generation providers. (See “Competition in the Electricity Industry” in Item 1.) As the number of bundled customers (i.e., those customers who receive electricity and distribution service from the Utility) declines, the rates for remaining customers could increase as the Utility would have a smaller customer base from which to recover certain procurement costs. Although the Utility is permitted to collect non-bypassable charges for above market generation-related costs incurred on behalf of former customers, the charges may not be sufficient for the Utility to fully recover these costs. In addition, the Utility’s ability to collect non-bypassable charges has been, and may continue to be, challenged by certain customer groups. Furthermore, if the former customers return to receiving electricity supply from the Utility, the Utility could incur costs to meet their electricity needs that it may not be able to timely recover through rates or that it may not be able to recover at all. In addition, increasing levels of self-generation of electricity by customers (primarily solar installations) and the use of customer NEM, which allows self-generating customers to receive bill credits for surplus power at the full retail rate, puts upward rate pressure on remaining customers. New rules and rates became effective for new NEM customers of the Utility in December 2016. New NEM customers are required to pay an interconnection fee, comply with time of use rates, and are required to pay certain non-bypassable charges to help fund some of the costs of low income, energy efficiency, and other programs that other customers pay. Remaining customers may incur significantly higher bills due to an increase in customers seeking alternative energy providers. The CPUC has indicated that it intends to revisit these rules in 2019. A confluence of technology-related cost declines and sustained federal or state subsidies could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility’s bundled electric service which could further threaten the Utility’s ability to recover its generation, transmission, and distribution investments. If the number of the Utility’s customers decreases or grows at a slower rate than anticipated, the Utility’s level of authorized capital investment could decline as well, leading to a slower growth in rate base and earnings. Reduced energy demand or significantly slowed growth in demand due to customer migration to other energy providers, adoption of energy efficient technology, conservation, increasing levels of distributed generation and self-generation, unless substantially offset through regulatory cost allocations, could materially affect PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, and cash flows. The CPUC has begun to implement rate reform to allow residential electric rates to more closely reflect the utilities’ actual costs of providing service and decrease cross-subsidization among customer classes. Many aspects of rate reform are not yet finalized, including time-of-use rates and whether the utilities can impose a fixed charge on certain customers. Further, changes in commodity prices also may have an adverse effect on the Utility’s ability to timely recover its operating costs and earn its authorized ROE. Although the Utility generally recovers its electricity and natural gas procurement costs from customers as “pass-through” costs, a significant and sustained rise in commodity prices could create overall rate pressures that make it more difficult for the Utility to recover its costs that are not categorized as “pass-through” costs. To relieve some of this upward rate pressure, the CPUC could authorize lower revenues than the Utility requested or disallow full cost recovery. If the Utility is unable to recover a material portion of its procurement costs and/or if the CPUC fails to adjust the Utility’s rates to reflect the impact of changing loads, the wide deployment of distributed generation, and the development of new electricity generation and energy storage technologies, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Risks Related to Liquidity and Capital Requirements The outcome or market perception of the investigations and litigation in connection with the Northern California wildfires, and the outcome or market perception of other litigation and enforcement matters, could reduce or eliminate PG&E Corporation’s and the Utility’s access to the capital markets and other sources of financing, which could have a material adverse effect on PG&E Corporation and the Utility. PG&E Corporation’s and the Utility’s liquidity is dependent on many factors, including access to the capital markets and availability under their revolving credit facilities and commercial paper programs. PG&E Corporation’s and the Utility’s ability to access the capital markets, the ability to borrow under their loan financing arrangements, including their revolving credit facilities, and the terms and rates of future financings, as well as the credit ratings of PG&E Corporation and the Utility and their respective debt facilities, could be materially affected by the outcome or market perception of the matters discussed in this 2017 Form 10-K under “Northern California Wildfires” in Note 13 of the Notes to the Consolidated Financial Statements in Item 8. Liabilities that could be incurred as a result of the Northern California wildfires could adversely affect their ability to comply with the covenants in their financing arrangements, which could adversely affect the ability to borrow under the applicable facility or program. Access by PG&E Corporation to the equity capital markets is also critical to maintaining the Utility’s CPUC-authorized capital structure. PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. In the fiscal year ended December 31, 2017, PG&E Corporation issued $416 million in common stock and made equity contributions of $455 million to the Utility. PG&E Corporation forecasts it will need a material amount of equity in future years, including to support the Utility’s capital expenditures. PG&E Corporation may also seek to issue additional equity to fund unrecoverable operating expenses and to pay claims, losses, fines and penalties that may be required by the outcome of enforcement matters and litigation, including in connection with the Northern California wildfires, and the outcome of the related CPUC and Cal Fire investigations. If either PG&E Corporation or the Utility is unable to access the capital markets or to borrow under their respective loan financing arrangements or commercial paper programs, PG&E Corporation and the Utility’s financial condition, results of operations, liquidity, and cash flows, could be materially affected. PG&E Corporation’s and the Utility’s ability to meet their debt service and other financial obligations and their ability to pay dividends depend on the Utility’s earnings and cash flows. In addition, in December 2017, the Boards of Directors suspended dividends on PG&E Corporation’s common stock and the Utility’s preferred stock, as a result of which the price of PG&E Corporation’s common stock and the ability of PG&E Corporation and the Utility to raise equity capital could be adversely affected. PG&E Corporation is a holding company with no revenue generating operations of its own. The Utility must use its resources to satisfy its own obligations, including the Utility’s obligation to serve customers, to pay principal and interest on outstanding debt, to pay preferred stock dividends, unless suspended, and meet its obligations to employees and creditors, before it can distribute cash to PG&E Corporation. Under the CPUC’s rules applicable to utility holding companies, the Utility’s dividend policy must be established by the Utility’s Board of Directors as though the Utility were a stand-alone utility company and PG&E Corporation’s Board of Directors must give “first priority” to the Utility’s capital requirements, as determined to be necessary and prudent to meet the Utility’s obligation to serve or to operate the Utility in a prudent and efficient manner. The CPUC has interpreted this “first priority” obligation to include the requirement that PG&E Corporation “infuse the Utility with all types of capital necessary for the Utility to fulfill its obligation to serve.” In addition, before the Utility can pay common stock dividends to PG&E Corporation, the Utility must maintain its authorized capital structure with an average 52% equity component. If the Utility were required to pay a material amount of fines or incur material unrecoverable costs in connection with the Northern California wildfires, the Butte fire, the pending CPUC investigations, the terms of probation or monitorship, or other liabilities or enforcement matters, it would require incremental equity contributions from PG&E Corporation to restore its capital structure. PG&E Corporation common stock issuances used to fund such equity contributions could materially dilute earnings per share. (See “Liquidity and Financial Resources” in Item 7. MD&A). Further, if PG&E Corporation were required to infuse the Utility with significant capital or if the Utility were unable to distribute cash to PG&E Corporation, or both, PG&E Corporation may be unable to pay principal and interest on its outstanding debt, pay its common stock dividend or meet other obligations. In December 2017, the Boards of Directors of PG&E Corporation and the Utility suspended dividends on common stock of PG&E Corporation and preferred stock of the Utility due to uncertainty related to the causes and potential liabilities associated with the Northern California wildfires. The suspension of dividends could continue to materially affect the price of PG&E Corporation’s common stock and adversely affect the ability of PG&E Corporation to raise additional equity capital. There can be no assurances as to when, if at all, the Board of Directors of PG&E Corporation and the Utility will determine to re-instate quarterly cash dividends on PG&E Corporation’s common stock or the Utility’s preferred stock. PG&E Corporation’s and the Utility’s financial results will be affected by their ability to continue accessing the capital markets and by the terms of debt and equity financings. PG&E Corporation and the Utility will continue to seek funds in the capital and credit markets to enable the Utility to make capital investments, and to pay fines that may be imposed in the future, as well as costs related to rights-of-way and legal and regulatory costs. PG&E Corporation’s and the Utility’s ability to access the capital and credit markets and the costs and terms of available financing depend primarily on PG&E Corporation’s and the Utility’s credit ratings and outlook. Their credit ratings and outlook can be affected by many factors, including pending or anticipated litigation, the pending Cal Fire and CPUC investigations and CPUC ratemaking proceedings, and by the December 20, 2017 decision of the Boards of Directors of PG&E Corporation and the Utility to suspend dividends, as well as the perceived impact of all such matters on PG&E Corporation’s and the Utility’s financial condition, whether or not such perception is accurate. On December 21, 2017, Moody's Investor Services and on December 22, 2017, Standard & Poor’s Global Ratings, each placed all of the ratings of PG&E Corporation and the Utility under review for downgrade, and Standard & Poor’s Global Ratings additionally lowered its ratings on the Utility’s preferred stock. If PG&E Corporation’s or the Utility’s credit ratings were to be downgraded or the ratings on the Utility’s preferred stock are further downgraded, in particular to below investment grade, their ability to access the capital and credit markets would be negatively affected and could result in higher borrowing costs, fewer financing options, including reduced, or lack of, access to the commercial paper market and additional collateral posting requirements, which in turn could affect liquidity and lead to an increased financing need. Other factors can affect the availability and terms of debt and equity financing, including changes in the federal or state regulatory environment affecting energy companies generally or PG&E Corporation and the Utility in particular, the overall health of the energy industry, an increase in interest rates by the Federal Reserve Bank, and general economic and financial market conditions. The reputations of PG&E Corporation and the Utility continue to suffer from the negative publicity about matters discussed under “Enforcement and Litigation Matters” in Item 3. Legal Proceedings and Note 13 of the Notes to the Consolidated Financial Statements in Item 8. The negative publicity and the uncertainty about the outcomes of these matters may undermine confidence in management’s ability to execute its business strategy and restore a constructive regulatory environment, which could adversely impact PG&E Corporation’s stock price. Further, the market price of PG&E Corporation common stock could decline materially depending on the outcome of these matters. The amount and timing of future share issuances also could affect the stock price. Risks Related to Operations and Information Technology The Utility’s electricity and natural gas operations are inherently hazardous and involve significant risks which, if they materialize, can adversely affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The Utility owns and operates extensive electricity and natural gas facilities, including two nuclear generation units and an extensive hydroelectric generating system. (See “Electric Utility Operations” and “Natural Gas Utility Operations” in Item 1. Business.) The Utility’s ability to earn its authorized ROE depends on its ability to efficiently maintain, operate, and protect its facilities, and provide electricity and natural gas services safely and reliably. The Utility undertakes substantial capital investment projects to construct, replace, and improve its electricity and natural gas facilities. In addition, the Utility is obligated to decommission its electricity generation facilities at the end of their useful operating lives, and the CPUC approved retirement of Diablo Canyon by 2024 and 2025. The Utility’s ability to safely and reliably operate, maintain, construct and decommission its facilities is subject to numerous risks, many of which are beyond the Utility’s control, including those that arise from: the breakdown or failure of equipment, electric transmission or distribution lines, or natural gas transmission and distribution pipelines, that can cause explosions, fires, or other catastrophic events; an overpressure event occurring on natural gas facilities due to equipment failure, incorrect operating procedures or failure to follow correct operating procedures, or welding or fabrication-related defects, that results in the failure of downstream transmission pipelines or distribution assets and uncontained natural gas flow; the failure to maintain adequate capacity to meet customer demand on the gas system that results in customer curtailments, controlled/uncontrolled gas outages, gas surges back into homes, serious personal injury or loss of life; a prolonged statewide electrical black-out that results in damage to the Utility’s equipment or damage to property owned by customers or other third parties; the failure to fully identify, evaluate, and control workplace hazards that result in serious injury or loss of life for employees or the public, environmental damage, or reputational damage; the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act; the failure of a large dam or other major hydroelectric facility, or the failure of one or more levees that protect land on which the Utility’s assets are built; the failure to take expeditious or sufficient action to mitigate operating conditions, facilities, or equipment, that the Utility has identified, or reasonably should have identified, as unsafe, which failure then leads to a catastrophic event (such as a wild land fire or natural gas explosion); inadequate emergency preparedness plans and the failure to respond effectively to a catastrophic event that can lead to public or employee harm or extended outages; operator or other human error; an ineffective records management program that results in the failure to construct, operate and maintain a utility system safely and prudently; construction performed by third parties that damages the Utility’s underground or overhead facilities, including, for example, ground excavations or “dig-ins” that damage the Utility’s underground pipelines; the release of hazardous or toxic substances into the air, water, or soil, including, for example, gas leaks from natural gas storage facilities; flaking lead-based paint from the Utility’s facilities, and leaking or spilled insulating fluid from electrical equipment; and attacks by third parties, including cyber-attacks, acts of terrorism, vandalism, or war. The occurrence of any of these events could interrupt fuel supplies; affect demand for electricity or natural gas; cause unplanned outages or reduce generating output; damage the Utility’s assets or operations; damage the assets or operations of third parties on which the Utility relies; damage property owned by customers or others; and cause personal injury or death. As a result, the Utility could incur costs to purchase replacement power, to repair assets and restore service, and to compensate third parties. Further, although the Utility often enters into agreements for third-party contractors to perform work, such as patrolling and inspection of facilities or the construction or demolition or facilities, the Utility may retain liability for the quality and completion of the contractor’s work and can be subject to penalties or other enforcement action if the contractor violates applicable laws, rules, regulations, or orders. The Utility may also be subject to liability, penalties or other enforcement action as a result of personal injury or death caused by third-party contractor actions. Insurance, equipment warranties, or other contractual indemnification requirements may not be sufficient or effective to provide full or even partial recovery under all circumstances or against all hazards or liabilities to which the Utility may become subject. An uninsured loss could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The Utility’s insurance coverage may not be sufficient to cover losses caused by an operating failure or catastrophic events, including severe weather events, or may not be available at a reasonable cost, or available at all. The Utility has experienced increased costs and difficulties in obtaining insurance coverage for wildfires that could arise from the Utility’s ordinary operations. PG&E Corporation, the Utility or its contractors and customers may experience coverage reductions and/or increased wildfire insurance costs in future years. No assurance can be given that future losses will not exceed the limits of the Utility’s insurance coverage. Uninsured losses and increases in the cost of insurance may not be recoverable in customer rates. A loss which is not fully insured or cannot be recovered in customer rates could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. As a result of the potential application of a strict liability standard under the doctrine of inverse condemnation, recent losses recorded by insurance companies, the risk of increase of wildfires including as a result of the ongoing drought, the Northern California wildfires, and the Butte fire, the Utility may not be able to obtain sufficient insurance coverage in the future at comparable cost and terms as the Utility’s current insurance coverage, or at all. In addition, the Utility is unable to predict whether it would be allowed to recover in rates the increased costs of insurance or the costs of any uninsured losses. Future insurance coverage may not be available at rates and on terms as favorable as the Utility’s current insurance coverage or may not be available at all. If the amount of insurance is insufficient or otherwise unavailable, or if the Utility is unable to recover in rates the costs of any uninsured losses, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The electric power industry is undergoing significant change driven by technological advancements and a decarbonized economy, which could materially impact the Utility’s operations, financial condition, and results of operations. The electric power industry is undergoing transformative change driven by technological advancements enabling customer choice (for example, customer-owned generation and energy storage) and state climate policy supporting a decarbonized economy. California's environmental policy objectives are accelerating the pace and scope of the industry change. The electric grid is a critical enabler of the adoption of new energy technologies that support California's climate change and GHG reduction objectives, which continue to be publicly supported by California policymakers notwithstanding a recent change in the federal approach to such matters. California utilities are experiencing increasing deployment by customers and third parties of DERs, such as on-site solar generation, energy storage, fuel cells, energy efficiency, and demand response technologies. This growth will require modernization of the electric distribution grid to, among other things, accommodate two-way flows of electricity, increase the grid's capacity, and interconnect DERs. In order to enable the California clean energy economy, sustained investments are required in grid modernization, renewable integration projects, energy efficiency programs, energy storage options, EV infrastructure and state infrastructure modernization (e.g. rail and water projects). To this end, the CPUC is conducting proceedings to: evaluate changes to the planning and operation of the electric distribution grid in order to prepare for higher penetration of DERs; consider future grid modernization and grid reinforcement investments; evaluate if traditional grid investments can be deferred by DERs, and if feasible, what, if any, compensation to utilities would be appropriate for enabling those investments; and clarify the role of the electric distribution grid operator. The CPUC has also recently opened proceedings regarding the creation of a shared database or statewide census of utility poles and conduits in California and increased access by communications providers to utility rights-of-way. This proceeding could require utilities to invest significant resources into inspecting poles and conduits, limit available capacity in existing rights-of-way, or impose other requirements on utilities facilities. The Utility is unable to predict the outcome of these proceedings. In addition, the CPUC has held discussions on potential changes to California’s electricity market. On May 19, 2017, California energy companies, along with other stakeholders, discussed customer choice and the future of the state’s electricity industry at a CPUC “en banc” meeting. Specifically, the goal of the “en banc” was to frame a discussion on the trends that are driving change within California’s electricity sector and overall clean-energy economy and to lay out elements of a path forward to ensure that California achieves its reliability, affordability, equity, and carbon reduction imperatives while recognizing the important role that technology and customer preferences will play in shaping this future. While the CPUC had indicated its intent to open a proceeding related to customer choice, the Utility is unable to predict whether that remains the CPUC’s intent or the timing of any such proceeding. The industry change, costs associated with complying with new regulatory developments and initiatives and with technological advancements, or the Utility’s inability to successfully adapt to changes in the electric industry, could materially affect the Utility’s operations, financial condition, and results of operations. A cyber incident, cyber security breach, severe natural event or physical attack on the Utility’s operational networks and information technology systems could have a material effect on its business, financial condition, results of operations, liquidity, and cash flows. The Utility’s electricity and natural gas systems rely on a complex, interconnected network of generation, transmission, distribution, control, and communication technologies, which can be damaged by natural events-such as severe weather or seismic events-and by malicious events, such as cyber and physical attacks. Private and public entities, such as the North American Electric Reliability Corporation, and U.S. Government Departments, including the Departments of Defense, Homeland Security and Energy, and the White House, have noted that cyber-attacks targeting utility systems are increasing in sophistication, magnitude, and frequency. The Utility’s operational networks also may face new cyber security risks due to modernizing and interconnecting the existing infrastructure with new technologies and control systems. Any failure or decrease in the functionality of the Utility’s operational networks could cause harm to the public or employees, significantly disrupt operations, negatively impact the Utility’s ability to safely generate, transport, deliver and store energy and gas or otherwise operate in the most safe and efficient manner or at all, and damage the Utility’s assets or operations or those of third parties. The Utility also relies on complex information technology systems that allow it to create, collect, use, disclose, store and otherwise process sensitive information, including the Utility’s financial information, customer energy usage and billing information, and personal information regarding customers, employees and their dependents, contractors, and other individuals. In addition, the Utility often relies on third-party vendors to host, maintain, modify, and update its systems, and to provide other services to the Utility or the Utility’s customers. These third-party vendors could cease to exist, fail to establish adequate processes to protect the Utility’s systems and information, or experience security incidents or inadequate security measures. Any incidents or disruptions in the Utility’s information technology systems could impact the Utility’s ability to track or collect revenues and to maintain effective internal controls over financial reporting. The Utility and its third party vendors have been subject to, and will likely continue to be subject to attempts to gain unauthorized access to the Utility’s information technology systems or confidential data (including information about customers and employees), or to disrupt the Utility’s operations. None of these attempts or breaches has individually or in the aggregate resulted in a security incident with a material impact on PG&E Corporation’s and the Utility’s financial condition and results of operations. Despite implementation of security and control measures, there can be no assurance that the Utility will be able to prevent the unauthorized access to its operational networks, information technology systems or data, or the disruption of its operations. Such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, penalties for violation of applicable privacy laws, investigations, and regulatory actions that could result in fines and penalties, loss of customers and harm to PG&E Corporation’s and the Utility’s reputation, any of which could have a material adverse effect on PG&E Corporation’s and the Utility’s financial condition and results of operations. The Utility maintains cyber liability insurance that covers certain damages caused by cyber incidents. However, there is no guarantee that adequate insurance will continue to be available at rates the Utility believes are reasonable or that the costs of responding to and recovering from a cyber incident will be covered by insurance or recoverable in rates. The operation and decommissioning of the Utility’s nuclear generation facilities expose it to potentially significant liabilities and the Utility may not be able to fully recover its costs if regulatory requirements change or the plant ceases operations before the licenses expire. The operation of the Utility’s nuclear generation facilities exposes it to potentially significant liabilities from environmental, health and financial risks, such as risks relating to the storage, handling and disposal of spent nuclear fuel, and the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act. If the Utility incurs losses that are either not covered by insurance or exceed the amount of insurance available, such losses could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the Utility may be required under federal law to pay up to $255 million of liabilities arising out of each nuclear incident occurring not only at the Utility’s Diablo Canyon facility but at any other nuclear power plant in the United States. (See Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) On January 11, 2018, the CPUC approved the retirement of Diablo Canyon units by 2024 and 2025. However, the Utility continues to face public concern about the safety of nuclear generation and nuclear fuel. Some of these nuclear opposition groups regularly file petitions at the NRC and in other forums challenging the actions of the NRC and urging governmental entities to adopt laws or policies in opposition to nuclear power. Although an action in opposition may ultimately fail, regulatory proceedings may take longer to conclude and be more costly to complete. It is also possible that public pressure could grow leading to adverse changes in legislation, regulations, orders, or their interpretation. As a result, operations at the Utility’s two nuclear generation units at Diablo Canyon could cease before their respective licenses expire in 2024 and 2025. In such an instance, the Utility could be required to record a charge for the remaining amount of its unrecovered investment and such charge could have a material effect on PG&E Corporation and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, in order to retain highly skilled personnel necessary to safely operate Diablo Canyon during the remaining years of operations, the Utility will incur costs in connection with (i) an employee retention program to ensure adequate staffing levels at Diablo Canyon, and (ii) an employee retraining and development program, to facilitate redeployment of a portion of Diablo Canyon personnel to the decommissioning project and elsewhere in the company. In its January 11, 2018 decision, the CPUC authorized rate recovery up to $211.3 million (compared with the $352.1 million requested by the Utility) for an employee retention program, but there can be no assurance that the Utility will be successful in retaining highly skilled personnel under such program. The Utility has incurred, and may continue to incur, substantial costs to comply with NRC regulations and orders. (See “Regulatory Environment” in Item 1. Business.) If the Utility were unable to recover these costs, PG&E Corporation’s and the Utility’s financial results could be materially affected. The Utility may determine that it cannot comply with the new regulations or orders in a feasible and economic manner and voluntarily cease operations; alternatively, the NRC may order the Utility to cease operations until the Utility can comply with new regulations, orders, or decisions. The Utility may incur a material charge if it ceases operations at Diablo Canyon’s two nuclear generation units before their respective licenses expire in 2024 and 2025. At December 31, 2017, the Utility’s unrecovered investment in Diablo Canyon was $1.7 billion. On June 28, 2016 the California State Lands Commission approved an extension of the Utility’s leases of coastal land occupied by the water intake and discharge structures for the nuclear generation units at Diablo Canyon, to run concurrently with Diablo Canyon’s current operating licenses. The Utility will be required to obtain an additional lease extension from the State Lands Commission to cover the period of time necessary to decommission the facility. The State Lands Commission and California Coastal Commission will evaluate appropriate environmental mitigation and development conditions associated with the decommissioning project, the costs of which could be substantial. The Utility also has an obligation to decommission its electricity generation facilities, including its nuclear facilities, as well as gas transmission system assets, at the end of their useful lives. (See Note 2: Summary of Significant Accounting Policies - Asset Retirement Obligations of the Notes to the Consolidated Financial Statement in Item 8.) The CPUC authorizes the Utility to recover its estimated costs to decommission its nuclear facilities through nuclear decommissioning charges that are collected from customers and held in nuclear decommissioning trusts to be used for the eventual decommissioning of each nuclear unit. If the Utility’s actual decommissioning costs, including the amounts held in the nuclear decommissioning trusts, exceed estimated costs, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility purchases its nuclear fuel assemblies from a sole source, Westinghouse. If Westinghouse experiences business disruptions as a result of Chapter 11 proceedings or its pending acquisition by Brookfield, the Utility could experience disruptions in nuclear fuel supply, and delays in connection with its Diablo Canyon outages and refuelings. The Utility purchases its nuclear fuel assemblies for Diablo Canyon from a sole source, Westinghouse. The Utility also stores nuclear fuel inventory at the Westinghouse fuel fabrication facility. In addition, Westinghouse provides the Utility with Diablo Canyon outage support services, nuclear fuel analysis, original equipment manufacturer engineering and parts support. On March 29, 2017, Westinghouse filed for Chapter 11 protection in the United States Bankruptcy Court, Southern District of New York. On January 4, 2018, Westinghouse announced that it has agreed to be acquired by Brookfield Business Partners L.P. Westinghouse also indicated that its acquisition by Brookfield is expected to close in the third quarter of 2018, subject to Bankruptcy Court approval and customary closing conditions including, among others, regulatory approvals. In the event that Westinghouse experiences business disruptions in its nuclear fuel business as a result of bankruptcy proceedings, its pending acquisition by Brookfield, or otherwise, the Utility could experience issues with its nuclear fuel supply and delays in connection with Diablo Canyon refueling outages. Diablo Canyon’s Unit 2 refueling outage will occur in the first quarter of 2018 and the required fuel for that outage has been delivered. The next Unit 1 refueling outage is expected to occur in the first quarter of 2019 and the fuel for that outage has not yet been fabricated. If Westinghouse were to fail to deliver nuclear fuel or provide outage support to the Utility, the Utility’s operation of Diablo Canyon would be adversely affected. PG&E Corporation and the Utility also could experience additional costs, including decreased electricity market revenues, in the event that one or both Diablo Canyon units are unable to operate. There can be no assurance that any such additional costs would be recoverable in the rates the Utility is permitted to recover from its customers. Furthermore, the Utility currently is not able to estimate the nature or amount of additional costs and expenses that it might incur in connection with the uncertainties surrounding Westinghouse but such costs and expenses could be material. For certain critical technologies, products and services, the Utility relies on a limited number of suppliers and, in some cases, sole suppliers. In the event these suppliers are unable to perform, the Utility could experience delays and disruptions in its operations while it transitions to alternative plans or suppliers. The Utility relies on a limited number of sole source suppliers for certain of its technologies, products and services. Although the Utility has long-term agreements with such suppliers, if the suppliers are unable to deliver these technologies, products or services, the Utility could experience delays and disruptions while it implements alternative plans and makes arrangements with acceptable substitute suppliers. As a result, the Utility’s business, financial condition, and results of operations could be significantly affected. As an example, the Utility relies on Silver Spring Networks, Inc. and Aclara Technologies LLC as suppliers of proprietary SmartMeter™ devices and software, and of managed services, utilized in its advanced metering system that collects electric and natural gas usage data from customers. If these suppliers encounter performance difficulties or are unable to supply these devices or maintain and update their software, or provide other services to maintain these systems, the Utility’s metering, billing, and electric network operations could be impacted and disrupted. Risks Related to Environmental Factors Severe weather conditions, extended drought and shifting climate patterns could materially affect PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, and cash flows. Extreme weather, extended drought and shifting climate patterns have intensified the challenges associated with wildfire management in California. Environmental extremes, such as drought conditions followed by periods of wet weather, can drive additional vegetation growth (which then fuel any fires) and influence both the likelihood and severity of extraordinary wildfire events. In California, over the past five years, inconsistent and extreme precipitation, coupled with more hot summer days, have increased the wildfire risk and made wildfire outbreaks increasingly difficult to manage. In particular, the risk posed by wildfires has increased in the Utility’s service area (the Utility has approximately 82,000 distribution overhead circuit miles and 18,000 transmission overhead circuit miles) as a result of an extended period of drought, bark beetle infestations in the California forest and wildfire fuel increases due to record rainfall following the drought, among other environmental factors. Other contributing factors include local land use policies and historical forestry management practices. The combined effects of extreme weather and climate change also impact this risk. Severe weather events, including wildfires and other fires, storms, tornadoes, floods, drought, earthquakes, tsunamis, pandemics, solar events, electromagnetic events, or other natural disasters such as wildfires, could result in severe business disruptions, prolonged power outages, property damage, injuries or loss of life, significant decreases in revenues and earnings, and/or significant additional costs to PG&E Corporation and the Utility. Any such event could have a material effect on PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, and cash flows. If the Utility is unable to recover its wildfire costs, due to the reasons described in the risk factors related to the Northern California fires, Butte fire, the doctrine of inverse condemnation, and insurance limitations above, or for other reasons, its financial condition, results of operations, liquidity, and cash flows could be materially affected. Further, the Utility has been studying the potential effects of climate change (increased temperatures, changing precipitation patterns, rising sea levels) on the Utility’s operations and is developing contingency plans to adapt to those events and conditions that the Utility believes are most significant. Scientists project that climate change will increase electricity demand due to more extreme, persistent and hot weather. As a result, the Utility’s hydroelectric generation could change and the Utility would need to consider managing or acquiring additional generation. If the Utility increases its reliance on conventional generation resources to replace hydroelectric generation and to meet increased customer demand, it may become more costly for the Utility to comply with GHG emissions limits. In addition, flooding caused by rising sea levels could damage the Utility’s facilities, including generation and electric transmission and distribution assets. The Utility could incur substantial costs to repair or replace facilities, restore service, or compensate customers and other third parties for damages or injuries. The Utility anticipates that the increased costs would be recovered through rates, but as rate pressures increase, the likelihood of disallowance or non-recovery may increase. Events or conditions caused by climate change could have a greater impact on the Utility’s operations than the Utility’s studies suggest and could result in lower revenues or increased expenses, or both. If the CPUC fails to adjust the Utility’s rates to reflect the impact of events or conditions caused by climate change, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility’s operations are subject to extensive environmental laws and changes in or liabilities under these laws could adversely affect PG&E Corporation’s and the Utility’s financial results. The Utility’s operations are subject to extensive federal, state, and local environmental laws, regulations, and orders, relating to air quality, water quality and usage, remediation of hazardous wastes, and the protection and conservation of natural resources and wildlife. The Utility incurs significant capital, operating, and other costs associated with compliance with these environmental statutes, rules, and regulations. The Utility has been in the past, and may be in the future, required to pay for environmental remediation costs at sites where it is identified as a potentially responsible party under federal and state environmental laws. Although the Utility has recorded liabilities for known environmental obligations, these costs can be difficult to estimate due to uncertainties about the extent of contamination, remediation alternatives, the applicable remediation levels, and the financial ability of other potentially responsible parties. (For more information, see Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) Environmental remediation costs could increase in the future as a result of new legislation, the current trend toward more stringent standards, and stricter and more expansive application of existing environmental regulations. Failure to comply with these laws and regulations, or failure to comply with the terms of licenses or permits issued by environmental or regulatory agencies, could expose the Utility to claims by third parties or the imposition of civil or criminal fines or other sanctions. The CPUC has authorized the Utility to recover its environmental remediation costs for certain sites through various ratemaking mechanisms. One of these mechanisms allows the Utility rate recovery for 90% of its hazardous substance remediation costs for certain approved sites without a reasonableness review. The CPUC may discontinue or change these ratemaking mechanisms in the future or the Utility may incur environmental costs that exceed amounts the CPUC has authorized the Utility to recover in rates. Some of the Utility’s environmental costs, such as the remediation costs associated with the Hinkley natural gas compressor site, are not recoverable through rates or insurance. (See “Environmental Regulation” in Item 1. and Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) The Utility’s costs to remediate groundwater contamination near the Hinkley natural gas compressor site and to abate the effects of the contamination have had, and may continue to have, a material effect on PG&E Corporation’s and the Utility’s financial results. Their financial results also can be materially affected by changes in estimated costs and by the extent to which actual remediation costs differ from recorded liabilities. State climate policy requires reductions in greenhouse gases of 40% by 2030 and 80% by 2050. Various proposals for addressing these reductions have the potential to reduce natural gas usage and increase natural gas costs. The future recovery of the increased costs associated with compliance is uncertain. The CARB is the state’s primary regulator for GHG emission reduction programs. Natural gas providers have been subject to compliance with CARB’s Cap-and-Trade Program since 2015, and natural gas end-use customers have an increasing exposure to carbon costs under the Program through 2030 when the full cost will be reflected in customer bills. CARB’s Scoping Plan also proposes various methods of reducing GHG emissions from natural gas. These include more aggressive energy efficiency programs to reduce natural gas end use, increased renewable portfolio standards generation in the electric sector reducing noncore gas load, and replacement of natural gas appliances with electric appliances, leading to further reduced demand. These natural gas load reductions may be partially offset by CARB’s proposals to deploy natural gas to replace wood fuel in home heating and diesel in transportation applications. CARB also proposes a displacement of some conventional natural gas with above-market renewable natural gas. The combination of reduced load and increased costs could result in higher natural gas customer bills and a potential mandate to deliver renewable natural gas could lead to cost recovery risk. Other Risk Factors The Utility may be required to incur substantial costs in order to obtain or renew licenses and permits needed to operate the Utility’s business and the Utility may be subject to fines and penalties for failure to comply or obtain license renewal. The Utility must comply with the terms of various governmental permits, authorizations, and licenses, including those issued by the FERC for the continued operation of the Utility’s hydroelectric generation facilities, and those issued by environmental and other federal, state and local governmental agencies. Many of the Utility’s capital investment projects, and some maintenance activities, often require the Utility to obtain land use, construction, environmental, or other governmental permits. These permits, authorizations, and licenses may be difficult to obtain on a timely basis, causing work delays. Further, existing permits and licenses could be revoked or modified by the agencies that granted them if facts develop that differ significantly from the facts assumed when they were issued. In addition, the Utility often seeks periodic renewal of a license or permit, such as a waste discharge permit or a FERC operating license for a hydroelectric generation facility. If a license or permit is not renewed for a particular facility and the Utility is required to cease operations at that facility, the Utility could incur an impairment charge or other costs. Before renewing a permit or license, the issuing agency may impose additional requirements that may increase the Utility’s compliance costs. In particular, in connection with a license renewal for one or more of the Utility’s hydroelectric generation facilities or assets, the FERC may impose new license conditions that could, among other things, require increased expenditures or result in reduced electricity output and/or capacity at the facility. In addition, local governments may attempt to assert jurisdiction over various utility operations by requiring permits or other approvals that the Utility has not been previously required to obtain. The Utility may incur penalties and sanctions for failure to comply with the terms and conditions of licenses and permits which could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. If the Utility cannot obtain, renew, or comply with necessary governmental permits, authorizations, licenses, ordinances, or other requirements, or if the Utility cannot recover the increase in associated compliance and other costs in a timely manner, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Poor investment performance or other factors could require PG&E Corporation and the Utility to make significant unplanned contributions to its pension plan, other postretirement benefits plans, and nuclear decommissioning trusts. PG&E Corporation and the Utility provide defined benefit pension plans and other postretirement benefits for eligible employees and retirees. The Utility also maintains three trusts for the purposes of providing funds to decommission its nuclear facilities. The performance of the debt and equity markets affects the value of plan assets and trust assets. A decline in the market value may increase the funding requirements for these plans and trusts. The cost of providing pension and other postretirement benefits is also affected by other factors, including interest rates used to measure the required minimum funding levels, the rate of return on plan assets, employee demographics, discount rates used in determining future benefit obligations, rates of increase in health care costs, future government regulation, and prior contributions to the plans. Similarly, funding requirements for the nuclear decommissioning trusts are affected by the rates of return on trust assets, changes in the laws or regulations regarding nuclear decommissioning or decommissioning funding requirements as well as changes in assumptions or forecasts related to decommissioning dates, technology and the cost of labor, materials and equipment. (See Note 2: Summary of Significant Accounting Policies of the Notes to the Consolidated Financial Statements in Item 8.) If the Utility is required to make significant unplanned contributions to fund the pension and postretirement plans or if actual nuclear decommissioning costs exceed the amount of nuclear decommissioning trust funds and the Utility is unable to recover the contributions or additional costs in rates, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility’s success depends on the availability of the services of a qualified workforce and its ability to maintain satisfactory collective bargaining agreements which cover a substantial number of employees. PG&E Corporation’s and the Utility’s results may suffer if the Utility is unable to attract and retain qualified personnel and senior management talent, or if prolonged labor disruptions occur. The Utility’s workforce is aging and many employees are or will become eligible to retire within the next few years. Although the Utility has undertaken efforts to recruit and train new field service personnel, the Utility may be faced with a shortage of experienced and qualified personnel. The majority of the Utility’s employees are covered by collective bargaining agreements with three unions. Labor disruptions could occur depending on the outcome of negotiations to renew the terms of these agreements with the unions or if tentative new agreements are not ratified by their members. In addition, some of the remaining non-represented Utility employees could join one of these unions in the future. PG&E Corporation and the Utility also may face challenges in attracting and retaining senior management talent especially if they are unable to restore the reputational harm generated by the negative publicity stemming from the ongoing enforcement proceedings. Any such occurrences could negatively impact PG&E Corporation’s and the Utility’s financial condition and results of operations. The Utility’s business activities are concentrated in one region, as a result of which, its future performance may be affected by events and factors unique to California. The Utility’s business activities are concentrated in Northern California. As a result, the Utility’s future performance may be affected by events and economic factors unique to California or by regional regulation or legislation, for example the doctrine of inverse condemnation. (See “The doctrine of inverse condemnation, if applied by courts in litigation to which PG&E Corporation and the Utility are subject, could significantly expand the potential liabilities from such litigation and materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows” above.) ITEM 1B.
Removed paragraphs (10177 words)
ITEM 1A. RISK FACTORS PG&E Corporation’s and the Utility’s financial results can be affected by many factors, including estimates and assumptions used in the critical accounting policies described in MD&A, that can cause their actual financial results to differ materially from historical results or from anticipated future financial results. The following discussion of key risk factors should be considered in evaluating an investment in PG&E Corporation and the Utility and should be read in conjunction with MD&A and the consolidated financial statements and related notes in Part II, Item 8, “Financial Statements and Supplementary Data” of this Form 10-K. Any of these factors, in whole or in part, could materially affect PG&E Corporation’s and the Utility’s business, results of operations, financial condition, and stock price. Risks Related to the Outcome of Enforcement Matters, Investigations, and Regulatory Proceedings PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows could be materially affected by the ultimate amount of third-party liability that the Utility incurs in connection with the Butte fire. In September 2015, a wildfire (known as the “Butte fire”) ignited and spread in Amador and Calaveras Counties in Northern California. On April 28, 2016, Cal Fire released its report of the investigation of the origin and cause of the wildfire. According to Cal Fire’s report, the fire burned 70,868 acres, resulted in two fatalities, destroyed 549 homes, 368 outbuildings and four commercial properties, and damaged 44 structures. Cal Fire’s report concluded that the wildfire was caused when a Gray Pine tree contacted the Utility’s electric line which ignited portions of the tree, and determined that the failure by the Utility and/or its vegetation management contractors, ACRT Inc. and Trees, Inc., to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree. In a press release also issued on April 28, 2016, Cal Fire indicated that it will seek to recover firefighting costs in excess of $90 million from the Utility. On May 23, 2016, individual plaintiffs filed a master complaint against the Utility and its two vegetation management contractors in the Superior Court of California for Sacramento County. Subrogation insurers also filed a separate master complaint on the same date. The California Judicial Council had previously authorized the coordination of all cases in Sacramento County. As of December 31, 2016, complaints have been filed against the Utility and its two vegetation management contractors in the Superior Court of California in the Counties of Calaveras, San Francisco, Sacramento, and Amador involving approximately 1,950 individual plaintiffs representing approximately 950 households and their insurance companies. These complaints are part of or are in the process of being added to the two master complaints. Plaintiffs seek to recover damages and other costs, principally based on inverse condemnation and negligence theories of liability. The number of individual complaints and plaintiffs may increase in the future. In connection with this matter, the Utility may be liable for property damages, interest, and attorneys’ fees without having been found negligent, through the theory of inverse condemnation. In addition, the Utility may be liable for fire suppression costs, personal injury damages, and other damages if the Utility were found to have been negligent. The Utility believes that it is probable that it will incur a loss of at least $750 million for all potential damages described above. The Utility has liability insurance from various insurers, which provides coverage for third-party liability attributable to the Butte fire in an aggregate amount of approximately $900 million. Such insurance coverage is subject to the terms and limitations of the available policies and may not be sufficient to cover the Utility’s ultimate liability. The process for estimating costs associated with claims relating to the Butte fire requires management to exercise significant judgment based on a number of assumptions and subjective factors. As more information becomes known, including additional discovery from the plaintiffs and results from the ongoing mediation and settlement process, management estimates and assumptions regarding the financial impact of the Butte fire may change. A change in management’s estimates or assumptions could result in an adjustment that could have a material impact on PG&E Corporation’s and the Utility’s financial condition and the results of operations during the period such change occurred. If the Utility records losses in connection with claims relating to the Butte fire that materially exceed the amount the Utility accrued for these liabilities, PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows could be materially affected in the reporting periods during which additional charges are recorded, depending on whether the Utility is able to record or collect insurance recoveries in amounts sufficient to offset such additional accruals. (For more information, see “Enforcement and Litigation Matters” in Item 7. MD&A and in Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) PG&E Corporation’s and the Utility’s future financial results may be materially affected by the outcomes of the CPUC’s investigative enforcement proceedings against the Utility, other known enforcement matters, and other ongoing state and federal investigations and requests for information. The Utility also could incur material costs and fines in connection with future investigations, citations, audits, or enforcement actions. The Utility could incur material charges, including fines and other penalties, in connection with a potential settlement or litigated outcome of the CPUC’s investigation of the Utility’s compliance with the CPUC’s rules regarding ex parte communications. While on October 14, 2016, the Cities of San Bruno and San Carlos, ORA, the SED, TURN, and the Utility submitted a status report to the CPUC which proposed an update to the framework for resolving the proceeding and included a total of 164 communications in the scope of the proceeding, the Utility expects that the other parties may argue that the number of violations exceeds the 164 communications referenced in the status report either because a single communication may have violated more than one rule or because they believe some of the material provided during discovery constitutes impermissible ex parte communications. The Utility expects to contest many of these assertions. If the matter does not settle, the CPUC will determine which communications included within the scope of the proceeding were in violation of its rules. The CPUC will also determine whether to impose penalties or other remedies, as a result of a potential settlement or otherwise. The CPUC can impose fines up to $50,000 for each violation, and up to $50,000 per day if the CPUC determines that the violation was continuing. The CPUC has wide discretion to determine the amount of penalties based on the totality of the circumstances, including such factors as how many days each violation continued; the gravity of the violations; the type of harm caused by the violations and the number of persons affected; and the good faith of the entity charged in attempting to achieve compliance, after notification of a violation. The CPUC is also required to consider the appropriateness of the amount of the penalty to the size of the entity charged. The CPUC has historically exercised broad discretion in determining whether violations are continuing and the amount of penalties to be imposed. While it is uncertain how the CPUC will calculate the number of violations or the penalty for any violations, such fines or penalties could be significant and materially affect PG&E Corporation’s and the Utility’s liquidity and results of operations. (See the discussion under the heading “Regulatory Matters” in MD&A.) The Utility also is a target of a number of investigations and government requests for information. In 2014, both the U.S. Attorney's Office in San Francisco and the California Attorney General's office opened investigations into matters related to allegedly improper communication between the Utility and CPUC personnel. In addition, in October 2016, the Utility received a grand jury subpoena and letter from the U.S. Attorney for the Northern District of California advising that the Utility is a target of a federal investigation regarding possible criminal violations of the Migratory Bird Treaty Act and conspiracy to violate the act. The Utility was also contacted by certain other federal agencies with requests for information. While the Utility believes that these requests for information are routine, their outcome is uncertain. The Utility also is unable to predict the outcome of pending investigations, including whether any charges will be brought against the Utility. If these investigations or requests for information result in enforcement action against the Utility, the Utility could incur additional fines or penalties or suffer negative consequences described above in the immediately preceding risk factor. In addition, a negative outcome in any of these investigations or future enforcement actions may negatively affect the outcome of future ratemaking and regulatory proceedings; for example, by enabling parties to challenge the Utility’s request to recover costs that the parties allege are somehow related to the Utility’s violations. The Utility may incur fines and penalties in connection with the Utility’s efforts to identify and remove encroachments from transmission pipeline rights of way and the Penalty Decision. The Penalty Decision requires the SED to review the Utility’s gas transmission operations (including the Utility’s compliance with the remedies ordered by the Penalty Decision) and to perform annual audits of the Utility’s record-keeping practices for a minimum of ten years. The SED could impose fines on the Utility or require the Utility to incur unrecoverable costs, or both, based on the outcome of these future audits. In addition, although PG&E Corporation and the Utility do not currently face the possibility of fines or penalties in the first phase of the CPUC’s pending investigation into the Utility’s safety culture since it has been categorized as rate setting, it is uncertain how a next phase, if any, would be categorized. (See the discussion under the heading “Regulatory Matters” in MD&A.) The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and resource adequacy requirements; customer billing; customer service; affiliate transactions; vegetation management; design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC general orders or other applicable CPUC decisions or regulations; federal electric reliability standards; and environmental compliance. CPUC staff could impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds could have a material effect on PG&E Corporation’s and the Utility’s financial results. PG&E Corporation’s and the Utility’s future financial results could be materially affected by the conviction of the Utility in the federal criminal proceeding and by the debarment proceeding. On August 9, 2016, the jury in the federal criminal trial against the Utility in the United States District Court for the Northern District of California, in San Francisco, found the Utility guilty on one count of obstructing a federal agency proceeding and five counts of violations of pipeline integrity management regulations of the Natural Gas Pipeline Safety Act. On January 26, 2017, the court issued a judgment of conviction against the Utility. The court sentenced the Utility to a five-year corporate probation period, oversight by a third-party monitor for a period of five years, with the ability to apply for early termination after three years, a fine of $3 million to be paid to the federal government, certain advertising requirements, and community service. The Utility has decided not to appeal the convictions. The probation includes a requirement that the Utility not commit any local, state or federal crimes during the probation period. As part of the probation, the Utility is required to retain a third-party monitor. The goal of the monitorship will be to prevent the criminal conduct with respect to gas pipeline transmission safety that gave rise to the conviction. To that end, the goal of the monitor will be to help ensure that the Utility takes reasonable and appropriate steps to maintain the safety of the gas transmission pipeline system, performs appropriate integrity management assessments on its gas transmission pipelines, and maintains an effective ethics and compliance program and safety related incentive program. After an initial assessment is conducted and an initial report is prepared by the monitor, the monitor will prepare reports on a semi-annual basis setting forth the monitor’s continued assessment and making recommendations consistent with the goals and scope of the monitorship. The Utility expects that the monitor will be retained before the end of the second quarter of 2017. At December 31, 2016, PG&E Corporation and the Utility’s Consolidated Balance Sheets included a $3 million accrual in connection with this matter. The Utility could incur material costs and additional penalties, not recoverable through rates, in the event of non-compliance with the terms of its probation and in connection with the monitorship (including but not limited to the monitor’s compensation or costs resulting from recommendations of the monitor). Also, in September 2015, the Utility was notified that the DOI had initiated an inquiry into whether the Utility should be suspended or debarred from entering into federal procurement and non-procurement contracts and programs citing the San Bruno explosion and indicating, as the basis for the inquiry, alleged poor record-keeping, poor identification and evaluation of threats to gas lines and obstruction of the NTSB’s investigation. On December 21, 2016, the Utility and the DOI entered into an interim administrative agreement that reflects the DOI’s determination that the Utility remains eligible to contract with federal government agencies while the DOI determines whether any further action is necessary to protect the federal government’s business interests. The agreement will be effective until superseded by an amended agreement or determination. The agreement also provides that the DOI is still conducting a review to determine whether the Utility has an effective compliance and ethics program and that the DOI is required to use its best efforts to complete its review before the end of 2017. If the DOI determines that the Utility’s program is not generally effective in preventing and detecting criminal conduct, the Utility may be required to enter into an amended administrative agreement and implement remedial and other measures, such as a requirement that the Utility’s natural gas operations and/or compliance and ethics programs be supervised by one or more independent third party monitor(s). The Utility’s conviction and the outcome of the debarment proceeding could harm the Utility’s relationships with regulators, legislators, communities, business partners, or other constituencies and make it more difficult to recruit qualified personnel and senior management. Further, they could negatively affect the outcome of future ratemaking and regulatory proceedings, for example by, enabling parties to argue that the Utility should not be allowed to recover costs that the parties allege are somehow related to the criminal charges on which the Utility was found guilty. They could also result in increased regulatory or legislative scrutiny with respect to various aspects of how the Utility’s business is conducted or organized. As discussed under the heading “Regulatory Matters” in Item 7. MD&A, the SED continues evaluating PG&E Corporation’s and the Utility’s organizational culture and governance in the CPUC’s pending investigation to examine the Utility’s safety culture. PG&E Corporation’s and the Utility’s financial results primarily depend on the outcomes of regulatory and ratemaking proceedings and the Utility’s ability to manage its operating expenses and capital expenditures so that it is able to earn its authorized rate of return in a timely manner. As a regulated entity, the Utility’s rates are set by the CPUC or the FERC on a prospective basis and are generally designed to allow the Utility to collect sufficient revenues to recover reasonable costs of providing service, including a return on its capital investments. PG&E Corporation’s and the Utility’s financial results could be materially affected if the CPUC or the FERC does not authorize sufficient revenues for the Utility to safely and reliably serve its customers and earn its authorized ROE. The outcome of the Utility’s ratemaking proceedings can be affected by many factors, including the Utility’s reputation (especially as a result of the Utility’s conviction in the federal criminal trial), the level of opposition by intervening parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of the Utility’s regulators, consumer and other stakeholder organizations, and customers, about the Utility’s ability to provide safe, reliable, and affordable electric and gas services. The Utility also is required to incur costs to comply with legislative and regulatory requirements and initiatives, such as those relating to the development of a state-wide electric vehicle charging infrastructure, the deployment of distributed energy resources, implementation of demand response and customer energy efficiency programs, energy storage and renewable energy targets, underground gas storage, and the construction of the California high-speed rail project. The Utility’s ability to recover costs, including its investments, associated with these and other legislative and regulatory initiatives will, in large part, depend on the final form of legislative or regulatory requirements, and whether the associated ratemaking mechanisms can be timely adjusted to reflect changes in customer demand for the Utility’s electricity and natural gas services. In addition to the amount of authorized revenues, PG&E Corporation’s and the Utility’s financial results could be materially affected if the Utility’s actual costs to safely and reliably serve its customers differ from authorized or forecast costs. The Utility may incur additional costs for many reasons including changing market circumstances, unanticipated events (such as storms, fires, accidents, catastrophic or other events affecting the Utility’s operations), or compliance with new state laws or policies. Although the Utility may be allowed to recover some or all of the additional costs, there may be a substantial time lag between when the Utility incurs the costs and when the Utility is authorized to collect revenues to recover such costs. Alternatively, the CPUC or the FERC may disallow costs that they determine were not reasonably or prudently incurred by the Utility. The Utility’s ability to recover its costs also may be affected by the economy and its impact on the Utility’s customers. For example, a sustained downturn or sluggishness in the economy could reduce the Utility’s sales to industrial and commercial customers or the level of uncollectible bills could increase. Although the Utility generally recovers its costs through rates, regardless of sales volume, rate pressures increase when the costs are borne by a smaller sales base. Changes in commodity prices also may have an adverse effect on the Utility’s ability to timely recover its operating costs and earn its authorized ROE. Although the Utility generally recovers its electricity and natural gas procurement costs from customers as “pass-through” costs, a significant and sustained rise in commodity prices could create overall rate pressures that make it more difficult for the Utility to recover its costs that are not categorized as “pass-through” costs. To relieve some of this upward rate pressure, the CPUC could authorize lower revenues than the Utility requested or disallow full cost recovery. PG&E Corporation’s and the Utility’s financial results depend upon the Utility’s continuing ability to recover “pass-through” costs, including electricity and natural gas procurement costs, from customers in a timely manner. The CPUC may disallow procurement costs for a variety of reasons. In addition, the Utility’s ability to recover these costs could be affected by the loss of Utility customers and decreased new customer growth, if the CPUC fails to adjust the Utility’s rates to reflect such events. The Utility meets customer demand for electricity from a variety of sources, including electricity generated from the Utility’s own generation facilities, electricity provided by third parties under power purchase agreements, and purchases on the wholesale electricity market. The Utility must manage these sources using the commercial and CPUC regulatory principles of “least cost dispatch” and prudent administration of power purchase agreements in compliance with its CPUC-approved long-term procurement plan. The CPUC could disallow procurement costs incurred by the Utility if the CPUC determines that the Utility did not comply with these principles or if the Utility did not comply with its procurement plan. Further, the contractual prices for electricity under the Utility’s current or future power purchase agreements could become uneconomic in the future for a variety of reasons, including developments in alternative energy technology, increased self-generation by customers, an increase in distributed generation, and lower customer demand due to adverse economic conditions or the loss of the Utility’s customers to other retail providers. In particular, the Utility will incur additional costs to procure renewable energy to meet the higher targets established by California SB 350 that became effective on January 1, 2016. Despite the CPUC’s current approval of the contracts, the CPUC could disallow contract costs in the future if it determines that the costs are unreasonably above market. The Utility’s ability to recover the costs it incurs in the wholesale electricity market may be affected by whether the CAISO wholesale electricity market continues to function effectively. Although market mechanisms are designed to limit excessive prices, these market mechanisms could fail, or the related systems and software on which the market mechanisms rely may not perform as intended which could result in excessive market prices. The CPUC could prohibit the Utility from passing through the higher costs of electricity to customers. For example, during the 2000 and 2001 energy crisis, the market mechanism flaws in California’s then-newly established wholesale electricity market led to dramatically high market prices for electricity that the Utility was unable to recover through customer rates, ultimately causing the Utility to file a petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code. Further, PG&E Corporation’s and the Utility’s financial results could be affected by the loss of Utility customers and decreasing bundled load that occurs through municipalization of the Utility’s facilities, an increase in the number of CCAs who provide electricity to their residents, and an increase in the number of consumers who become direct access customers of alternative generation providers. (See “Competition in the Electricity Industry” in Item 1.) As the number of bundled customers (i.e., those customers who receive electricity and distribution service from the Utility) declines, the rates for remaining customers could increase as the Utility would have a smaller customer base from which to recover certain procurement costs. Although the Utility is permitted to collect non-bypassable charges for above market generation-related costs incurred on behalf of former customers, the charges may not be sufficient for the Utility to fully recover these costs. In addition, the Utility’s ability to collect non-bypassable charges has been, and may continue to be, challenged by certain customer groups. Furthermore, if the former customers return to receiving electricity supply from the Utility, the Utility could incur costs to meet their electricity needs that it may not be able to timely recover through rates or that it may not be able to recover at all. In addition, increasing levels of self-generation of electricity by customers (primarily solar installations) and the use of customer net energy metering (“NEM”), which allows self-generating customers to receive bill credits for surplus power at the full retail rate, puts upward rate pressure on remaining customers. In January 2016, the CPUC adopted new NEM rules and rates. The new rules and rates became effective for new NEM customers of the Utility in December 2016. New NEM customers will be required to pay an interconnection fee, will go on time of use rates, and will be required to pay some non-bypassable charges to help fund some of the costs of low income, energy efficiency, and other programs that other customers pay. However, the resulting rules will still put upward rate pressure on remaining customers, and remove the cap on the number of NEM customers. Significantly higher bills for remaining customers may result in a decline of the number of such customers as they may seek alternative energy providers. The CPUC states that it intends to revisit these rules in 2019. A confluence of technology-related cost declines and sustained federal or state subsidies could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility’s bundled electric service which could further threaten the Utility’s ability to recover its generation, transmission, and distribution investments. If the number of the Utility’s customers decreases or grows at a slower rate than anticipated, the Utility’s level of capital investment would likely decline as well, in turn leading to a slower growth in rate base and earnings. Reduced energy demand or significantly slowed growth in demand due to customer migration to other energy providers, adoption of energy efficient technology, conservation, increasing levels of distributed generation and self-generation, unless substantially offset through regulatory cost allocations, could adversely impact PG&E Corporation’s and the Utility’s financial results. The CPUC has begun to implement rate reform to allow residential electric rates to more closely reflect the utilities’ actual costs of providing service and decrease cost-subsidization among customer classes. Many aspects of rate reform are not yet finalized, including time-of-use rates and whether the utilities can impose a fixed charge on certain customers. If the Utility is unable to recover a material portion of its procurement costs and/or if the CPUC fails to adjust the Utility’s rates to reflect the impact of changing loads, the wide deployment of distributed generation, and the development of new electricity generation and energy storage technologies, PG&E Corporation’s and the Utility’s financial results could be materially affected. Risks Related to Liquidity and Capital Requirements PG&E Corporation’s and the Utility’s financial results will be affected by their ability to continue accessing the capital markets and by the terms of debt and equity financings. PG&E Corporation and the Utility will continue to seek funds in the capital and credit markets to enable the Utility to make capital investments, pay fines that may be imposed in the future, as well as costs related to rights-of-way and legal and regulatory costs. PG&E Corporation’s and the Utility’s ability to access the capital and credit markets and the costs and terms of available financing depend primarily on PG&E Corporation’s and the Utility’s credit ratings and outlook. Their credit ratings and outlook can be affected by many factors, including the pending CPUC investigations and ratemaking proceedings. If PG&E Corporation’s or the Utility’s credit ratings were downgraded to below investment grade, their ability to access the capital and credit markets would be negatively affected and could result in higher borrowing costs, fewer financing options, including reduced, or lack of, access to the commercial paper market, additional collateral posting requirements, which in turn could affect liquidity and lead to an increased financing need. Other factors can affect the availability and terms of debt and equity financing, including changes in the federal or state regulatory environment affecting energy companies generally or PG&E Corporation and the Utility in particular, the overall health of the energy industry, volatility in electricity or natural gas prices, an increase in interest rates by the Federal Reserve Bank, and general economic and financial market conditions. The reputations of PG&E Corporation and the Utility continue to suffer from the negative publicity about matters discussed under “Enforcement and Litigation Matters” in Item 7. MD&A. The negative publicity and the uncertainty about the outcomes of these matters may undermine confidence in management’s ability to execute its business strategy and restore a constructive regulatory environment, which could adversely impact PG&E Corporation’s stock price. Further, the market price of PG&E Corporation common stock could decline materially depending on the outcome of these matters. The amount and timing of future share issuances also could affect the stock price. If the Utility were unable to access the capital markets, it could be required to decrease or suspend dividends to PG&E Corporation and PG&E Corporation could be required to contribute capital to the Utility to enable the Utility to fulfill its obligation to serve. To maintain PG&E Corporation’s dividend level in these circumstances, PG&E Corporation would be further required to access the capital or credit markets. PG&E Corporation may need to decrease or discontinue its common stock dividend if it is unable to access the capital or credit markets on reasonable terms. PG&E Corporation’s ability to meet its debt service and other financial obligations and to pay dividends on its common stock depends on the Utility’s earnings and cash flows. PG&E Corporation is a holding company with no revenue generating operations of its own. The Utility must use its resources to satisfy its own obligations, including its obligation to serve customers, to pay principal and interest on outstanding debt, to pay preferred stock dividends, and meet its obligations to employees and creditors, before it can distribute cash to PG&E Corporation. Under the CPUC’s rules applicable to utility holding companies, the Utility’s dividend policy must be established by the Utility's Board of Directors as though the Utility were a stand-alone utility company and PG&E Corporation’s Board of Directors give “first priority” to the Utility’s capital requirements, as determined to be necessary and prudent to meet the Utility’s obligation to serve or to operate the Utility in a prudent and efficient manner. The CPUC has interpreted this “first priority” obligation to include the requirement that PG&E Corporation “infuse the Utility with all types of capital necessary for the Utility to fulfill its obligation to serve.” In addition, before the Utility can pay common stock dividends to PG&E Corporation, the Utility must maintain its authorized capital structure with an average 52% equity component. If the Utility were required to pay a material amount of fines or incur material unrecoverable costs in connection with the terms of the probation or monitorship, the pending CPUC investigations, or other enforcement matters, it would require incremental equity contributions from PG&E Corporation to restore its capital structure. PG&E Corporation common stock issuances used to fund such equity contributions could materially dilute EPS. (See “Liquidity and Financial Resources” in Item 7. MD&A.) Further, if PG&E Corporation were required to infuse the Utility with significant capital or if the Utility was unable to distribute cash to PG&E Corporation, or both, PG&E Corporation may be unable to pay principal and interest on its outstanding debt, pay its common stock dividend, or meet other obligations. PG&E Corporation’s and the Utility’s ability to pay dividends also could be affected by financial covenants contained in their respective credit agreements that require each company to maintain a ratio of consolidated total debt to consolidated capitalization of at most 65%. Risks Related to Operations and Information Technology The Utility’s electricity and natural gas operations are inherently hazardous and involve significant risks which, if they materialize, can adversely affect PG&E Corporation’s and the Utility’s financial results. The Utility’s insurance may not be sufficient to cover losses caused by an operating failure or catastrophic event, or may not become available at a reasonable cost, or available at all. The Utility owns and operates extensive electricity and natural gas facilities, including two nuclear generation units and an extensive hydroelectric generating system. (See “Electric Utility Operations” and “Natural Gas Utility Operations” in Item 1. Business.) The Utility’s ability to earn its authorized ROE depends on its ability to efficiently maintain, operate, and protect its facilities, and provide electricity and natural gas services safely and reliably. The Utility undertakes substantial capital investment projects to construct, replace, and improve its electricity and natural gas facilities. In addition, the Utility is obligated to decommission its electricity generation facilities at the end of their useful operating lives. The Utility’s ability to safely and reliably operate, maintain, construct and decommission its facilities is subject to numerous risks, many of which are beyond the Utility’s control, including those that arise from: ● the breakdown or failure of equipment, electric transmission or distribution lines, or natural gas transmission and distribution pipelines, that can cause explosions, fires, or other catastrophic events; ● an overpressure event occurring on natural gas facilities due to equipment failure, incorrect operating procedures or failure to follow correct operating procedures, or welding or fabrication-related defects, that results in the failure of downstream transmission pipelines or distribution assets and uncontained natural gas flow; ● failure to maintain adequate capacity to meet customer demand on the gas system that results in customer curtailments, controlled/uncontrolled gas outages, gas surges back into homes, serious personal injury or loss of life; ● a prolonged statewide electrical black-out that results in damage to the Utility’s equipment or damage to property owned by customers or other third parties; ● the failure to fully identify, evaluate, and control workplace hazards that result in serious injury or loss of life for employees or the public, environmental damage, or reputational damage; ● the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act; ● the failure of a large dam or other major hydroelectric facility, or the failure of one or more levees that protect land on which the Utility’s assets are built; ● the failure to take expeditious or sufficient action to mitigate operating conditions, facilities, or equipment, that the Utility has identified, or reasonably should have identified, as unsafe, which failure then leads to a catastrophic event (such as a wild land fire or natural gas explosion), and the failure to respond effectively to a catastrophic event; ● inadequate emergency preparedness plans and the failure to respond effectively to a catastrophic event that can lead to public or employee harm or extended outages; ● severe weather events such as storms, tornadoes, floods, drought, earthquakes, tsunamis, wild land and other fires, pandemics, solar events, electromagnetic events, or other natural disasters; ● operator or other human error; ● an ineffective records management program that results in the failure to construct, operate and maintain a utility system safely and prudently; ● construction performed by third parties that damage the Utility’s underground or overhead facilities, including, for example, ground excavations or “dig-ins” that damage the Utility’s underground pipelines; ● the release of hazardous or toxic substances into the air, water, or soil, including, for example, gas leaks from natural gas storage facilities; flaking lead-based paint from the Utility’s facilities, and leaking or spilled insulating fluid from electrical equipment; and ● attacks by third parties, including cyber-attacks, acts of terrorism, vandalism, or war. The occurrence of any of these events could interrupt fuel supplies; affect demand for electricity or natural gas; cause unplanned outages or reduce generating output; damage the Utility’s assets or operations; damage the assets or operations of third parties on which the Utility relies; damage property owned by customers or others; and cause personal injury or death. As a result, the Utility could incur costs to purchase replacement power, to repair assets and restore service, and to compensate third parties. In particular, the Utility may incur material liability in connection with the Butte fire. (See “PG&E Corporation and the Utility may incur material liability in connection with Butte Fire” above.) Additionally, on January 12, 2017, a residential structure fire occurred in Yuba City, California resulting in the collapse of the house and injuries to two persons inside the house. The CPUC, a third-party engineering firm, and local fire and police officials are investigating the origin and cause of the incident. The Utility may incur material costs, including as a result of these investigations or any proceedings that could be commenced in connection with this incident. Further, although the Utility often enters into agreements for third-party contractors to perform work, such as patrolling and inspection of facilities or the construction or demolition or facilities, the Utility may retain liability for the quality and completion of the contractor’s work and can be subject to penalties or other enforcement action if the contractor violates applicable laws, rules, regulations, or orders. The Utility may also be subject to liability, penalties or other enforcement action as a result of personal injury or death caused by third-party contractor actions. Insurance, equipment warranties, or other contractual indemnification requirements may not be sufficient or effective to provide full or even partial recovery under all circumstances or against all hazards or liabilities to which the Utility may become subject. An uninsured loss could have a material effect on PG&E Corporation’s and the Utility’s financial results. Future insurance coverage may not be available at rates and on terms as favorable as the Utility’s current insurance coverage or may not be available at all. Further, California law includes a doctrine of inverse condemnation that is routinely invoked in California for wildfire damages. Inverse condemnation imposes strict liability (including liability for attorneys’ fees) for damages and takings as a result of the design, construction and maintenance of utility facilities, including its electric transmission lines. As a result of the strict liability standard applied to wildfires, recent losses recorded by insurance companies, the risk of increase of wildfires including as a result of the ongoing drought, and the Butte fire, the Utility may not be able to obtain sufficient insurance coverage in the future at comparable cost and terms as the Utility’s current insurance coverage, or at all. In addition, the Utility is unable to predict whether it would be allowed to recover in rates the increased costs of insurance or the costs of any uninsured losses. If the amount of insurance is insufficient or otherwise unavailable, or if the Utility is unable to recover in rates the costs of any uninsured losses, PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows could be materially affected. The Utility’s operational and information technology systems could fail to function properly or be improperly accessed or damaged by third parties (including cyber-attacks and physical acts) or damaged by severe weather, natural disasters, or other events. Any of these events could disrupt the Utility’s operations and cause the Utility to incur unanticipated losses and expense or liability to third parties. The operation of the Utility’s extensive electricity and natural gas systems relies on evolving and increasingly complex operational and information technology systems and network infrastructures that are interconnected with the systems and network infrastructure owned by third parties. All of the Utility’s operational and technology systems and network infrastructure are vulnerable to disability or failures in the event of cyber-attacks and physical acts. Cyber-attacks are increasingly sophisticated and may include computer hacking, viruses, malware, social engineering, denial of service attacks, ransomware, destructive malware, or other means of disruption, destruction, or unauthorized access, acquisition or control. In addition, hardware, software, or applications the Utility develops or procures from third parties may contain defects in design or manufacture or other problems that could unexpectedly compromise information security. Physical attacks may include acts of sabotage, acts of war, acts of terrorism, or other physical acts. The Utility’s operational and information technology systems and networks are deemed critical infrastructure, and any failure or decrease in their functionality could, among other things, cause harm to the public or employees, significantly disrupt operations, negatively impact the Utility’s ability to generate, transport, deliver and store energy and gas, or otherwise operate in the most efficient manner or at all, undermine the Utility’s performance of critical business functions, damage the Utility’s assets or operations or those of third parties, and lead to reputational harm. As a result, such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, investigations, and regulatory actions that could result in fines and penalties, and loss of customers, any of which could have a material effect on PG&E Corporation’s and the Utility’s financial condition and results of operations. The Utility’s systems, including its financial information, operational systems, advanced metering, and billing systems, require ongoing maintenance, modification, and updating, which can be costly and increase the risk of errors and malfunction. The Utility often relies on third-party vendors to host, maintain, modify, and update its systems and these third-party vendors could cease to exist, fail to establish adequate processes to protect the Utility’s systems and information, or experience internal or external security incidents. Any incidents, disruptions or deficiencies in existing systems, or disruptions, delays or deficiencies in the modification of existing systems or implementation of new systems could result in increased costs, the inability to track or collect revenues, or diversion of management’s and employees’ attention and resources, or negatively affect the Utility’s ability to maintain effective financial controls or timely file required regulatory reports. The Utility also could be subject to patent infringement claims arising from the use of third-party technology by the Utility or by a third-party vendor. In addition, the Utility’s information systems contain confidential information, including information about customers and employees. A data breach involving theft, improper disclosure, or other unauthorized access to or acquisition of confidential information could subject the Utility to penalties for violation of applicable privacy laws, claims by third parties, and enforcement actions by government agencies. It could also reduce the value of proprietary information, and harm the Utility’s reputation. The Utility and its third party vendors have been subject, and will likely continue to be subject, to attempts to gain unauthorized access to the Utility’s information technology systems, or confidential data, or to disrupt the Utility’s operations. None of these attempts or breaches has individually or in the aggregate resulted in a security incident with a material impact on PG&E Corporation’s and the Utility’s financial condition and results of operations. Despite implementation of security and control measures, there can be no assurance that the Utility will be able to prevent the unauthorized access to its systems, infrastructure, or data, or the disruption of its operations, either of which could materially affect PG&E Corporation’s and the Utility’s financial condition and results of operations. While the Utility maintains cyber liability insurance that covers certain damages caused by cyber incidents, there is no guarantee that adequate insurance will continue to be available at rates the Utility believes are reasonable or that the costs of responding to and recovering from a cyber incident will be covered by insurance or recoverable in rates. The operation and decommissioning of the Utility’s nuclear power plants expose it to potentially significant liabilities and the Utility may not be able to fully recover its costs if regulatory requirements change or the plant ceases operations before the licenses expire. The operation of the Utility’s nuclear generation facilities exposes it to potentially significant liabilities from environmental, health and financial risks, such as risks relating to the storage, handling and disposal of spent nuclear fuel, and the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act. If the Utility incurs losses that are either not covered by insurance or exceed the amount of insurance available, such losses could have a material effect on PG&E Corporation’s and the Utility’s financial results. In addition, the Utility may be required under federal law to pay up to $255 million of liabilities arising out of each nuclear incident occurring not only at the Utility’s Diablo Canyon facility but at any other nuclear power plant in the United States. (See Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) On August 11, 2016, the Utility submitted an application to the CPUC to retire Diablo Canyon at the expiration of its current operating licenses in 2024 and 2025 and replace it with a portfolio of energy efficiency and GHG-free resources. The application includes a joint proposal between the Utility and certain interested parties, entered into on June 20, 2016. However, the Utility continues to face public concern about the safety of nuclear generation and nuclear fuel. Some of these nuclear opposition groups regularly file petitions at the NRC and in other forums challenging the actions of the NRC and urging governmental entities to adopt laws or policies in opposition to nuclear power. Although an action in opposition may ultimately fail, regulatory proceedings may take longer to conclude and be more costly to complete. It is also possible that public pressure could grow leading to adverse changes in legislation, regulations, orders, or their interpretation. As a result, operations at the Utility’s two nuclear generation units at Diablo Canyon could cease before the licenses expire in 2024 and 2025. In such an instance, the Utility could be required to record a charge for the remaining amount of its unrecovered investment and such charge could have a material effect on PG&E Corporation and the Utility’s financial results. In addition, in order to retain highly skilled personnel necessary to safely operate Diablo Canyon during the remaining years of operations, the Utility will incur costs in connection with (i) an employee retention program to ensure adequate staffing levels at Diablo Canyon, and (ii) an employee retraining and development program, to facilitate redeployment of a portion of Diablo Canyon personnel to the decommissioning project and elsewhere in the company. The Utility currently estimates that the additional cost of the employee retention program and the employee retraining and development program will be approximately $350 million. The Joint Proposal seeks confirmation from the CPUC that these costs will be recovered through the Utility’s nuclear decommissioning electric rates. The employee retention and retraining and development programs are subject to bargaining with the Utility’s labor unions. The Utility will also incur costs in connection with an employee severance program. The severance program was previously approved by the CPUC in prior nuclear decommissioning ratemaking proceedings. The Utility has incurred, and may continue to incur, substantial costs to comply with NRC regulations and orders. (See “Regulatory Environment” in Item 1. Business.) If the Utility were unable to recover these costs, PG&E Corporation’s and the Utility’s financial results could be materially affected. The Utility may determine that it cannot comply with the new regulations or orders in a feasible and economic manner and voluntarily cease operations; alternatively, the NRC may order the Utility to cease operations until the Utility can comply with new regulations, orders, or decisions. The Utility may incur a material charge if it ceases operations at Diablo Canyon before the licenses expire in 2024 and 2025. At December 31, 2016, the Utility’s unrecovered investment in Diablo Canyon was $1.7 billion. At the state level, the California Water Board has adopted a policy on once-through cooling that generally requires the installation of cooling towers or other significant measures to reduce the impact on marine life from existing power generation facilities in California by at least 85%. If the California Water Board requires the installation of cooling towers that the Utility believes are not technically or economically feasible, the Utility may be forced to cease operations at Diablo Canyon and may incur a material charge. If the Utility obtains contingent approvals referred to herein that will result in retiring Diablo Canyon at the end of the current NRC operating licenses, the Utility will not be required to install cooling towers or implement alternative measures in order to comply with the California State Water Board Once-Through Cooling Water Policy, thus eliminating the regulatory uncertainty regarding the measures that could have been imposed on the Utility or of incurring a material charge related thereto. Even if the Utility is ultimately not required to install cooling towers, under the State Water Board’s interim mitigation measures applicable to Diablo Canyon’s operations prior to 2025, starting in 2016, it will be required to make payments to the California Coastal Conservancy to fund various environmental mitigation projects, that the Utility does not expect to exceed $5 million per year. On June 28, 2016 the California State Lands Commission approved an extension of the Utility’s leases of coastal land occupied by the water intake and discharge structures for the nuclear generation units at Diablo Canyon, to run concurrently with Diablo Canyon’s current operating licenses. The Utility will be required to obtain an additional lease extension from the State Lands Commission to cover the period of time necessary to decommission the facility. The State Lands Commission and California Coastal Commission will evaluate appropriate environmental mitigation and development conditions associated with the decommissioning project, the costs of which could be substantial. The Utility also has an obligation to decommission its electricity generation facilities, including its nuclear facilities, as well as gas transmission system assets, at the end of their useful lives. (See Note 2: Summary of Significant Accounting Policies - Asset Retirement Obligations of the Notes to the Consolidated Financial Statement in Item 8.) The CPUC authorizes the Utility to recover its estimated costs to decommission its nuclear facilities through nuclear decommissioning charges that are collected from customers and held in nuclear decommissioning trusts to be used for the eventual decommissioning of each nuclear unit. If the Utility’s actual decommissioning costs, including the amounts held in the nuclear decommissioning trusts, exceed estimated costs, PG&E Corporation’s and the Utility’s financial results could be materially affected. Risks Related to Environmental Factors The Utility’s operations are subject to extensive environmental laws and changes in or liabilities under these laws could adversely affect PG&E Corporation’s and the Utility’s financial results. The Utility’s operations are subject to extensive federal, state, and local environmental laws, regulations, orders, relating to air quality, water quality and usage, remediation of hazardous wastes, and the protection and conservation of natural resources and wildlife. The Utility incurs significant capital, operating, and other costs associated with compliance with these environmental statutes, rules, and regulations. The Utility has been in the past, and may be in the future, required to pay for environmental remediation costs at sites where it is identified as a potentially responsible party under federal and state environmental laws. Although the Utility has recorded liabilities for known environmental obligations, these costs can be difficult to estimate due to uncertainties about the extent of contamination, remediation alternatives, the applicable remediation levels, and the financial ability of other potentially responsible parties. (For more information, see Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) Environmental remediation costs could increase in the future as a result of new legislation, the current trend toward more stringent standards, and stricter and more expansive application of existing environmental regulations. Failure to comply with these laws and regulations, or failure to comply with the terms of licenses or permits issued by environmental or regulatory agencies, could expose the Utility to claims by third parties or the imposition of civil or criminal fines or other sanctions. The CPUC has authorized the Utility to recover its environmental remediation costs for certain sites through various ratemaking mechanisms. One of these mechanisms allows the Utility rate recovery for 90% of its hazardous substance remediation costs for certain approved sites without a reasonableness review. The CPUC may discontinue or change these ratemaking mechanisms in the future or the Utility may incur environmental costs that exceed amounts the CPUC has authorized the Utility to recover in rates. Some of the Utility’s environmental costs, such as the remediation costs associated with the Hinkley natural gas compressor site, are not recoverable through rates or insurance. (See “Environmental Regulation” in Item 1.) The Utility’s costs to remediate groundwater contamination near the Hinkley natural gas compressor site and to abate the effects of the contamination have had, and may continue to have, a material effect on PG&E Corporation’s and the Utility’s financial results. Their financial results also can be materially affected by changes in estimated costs and by the extent to which actual remediation costs differ from recorded liabilities. The Utility’s future operations may be affected by climate change that may have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. The Utility has been studying the potential effects of climate change (increased temperatures, changing precipitation patterns, rising sea levels) on the Utility’s operations and is developing contingency plans to adapt to those events and conditions that the Utility believes are most significant. Scientists project that climate change will increase electricity demand due to more extreme, persistent and hot weather. While snowpack in the Sierra Nevada Mountains has been at higher than normal levels this winter, California has experienced ongoing drought in the past. If temperatures and the levels of precipitation in the Utility’s service territory continue to change, that could impact the levels of snowpack in the Sierra Nevada Mountains. As a result, the Utility’s hydroelectric generation could change and the Utility would need to consider managing or acquiring additional generation. If the Utility increases its reliance on conventional generation resources to replace hydroelectric generation and to meet increased customer demand, it may become more costly for the Utility to comply with GHG emissions limits. In addition, increasing temperatures and lower levels of precipitation could increase the occurrence of wildfires in the Utility’s service territory causing damage to the Utility’s facilities or the facilities of third parties on which the Utility relies to provide service, damage to third parties for loss of property, personal injury, or loss of life. In addition, flooding caused by rising sea levels could damage the Utility’s facilities, including hydroelectric assets such as dams and canals, and the electric transmission and distribution assets. The Utility could incur substantial costs to repair or replace facilities, restore service, compensate customers and other third parties for damages or injuries. The Utility anticipates that the increased costs would be recovered through rates, but as rate pressures increase, the likelihood of disallowance or non-recovery may increase. Events or conditions caused by climate change could have a greater impact on the Utility’s operations than the Utility’s studies suggest and could result in lower revenues or increased expenses, or both. If the CPUC fails to adjust the Utility’s rates to reflect the impact of events or conditions caused by climate change, PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows could be materially affected. Other Risk Factors PG&E Corporation’s and the Utility’s financial results could be materially affected as a result of political and legislative developments. The Utility’s financial results could be materially affected as a result of the recent change in federal administration from President Barack Obama to President Donald Trump. For example, the new administration has indicated tax reform as a priority. Tax reform outlines produced by both President Trump and the Tax Reform Task Force include proposals related to federal tax rates, deductions for state income taxes (and potentially property tax), interest expense deduction, capital expenditure deduction, and expensing plant. It is unclear what tax reform may be ultimately adopted. It is generally expected that a tax reform bill will be introduced in early 2017. The Utility may be required to incur substantial costs in order to obtain or renew licenses and permits needed to operate the Utility’s business and the Utility may be subject to fines and penalties for failure to comply or obtain license renewal. The Utility must comply with the terms of various governmental permits, authorizations, and licenses, including those issued by the FERC for the continued operation of the Utility’s hydroelectric generation facilities, and those issued by environmental and other federal, state and local governmental agencies. Many of the Utility’s capital investment projects, and some maintenance activities, often require the Utility to obtain land use, construction, environmental, or other governmental permits. These permits, authorizations, and licenses may be difficult to obtain on a timely basis, causing work delays. Further, existing permits and licenses could be revoked or modified by the agencies that granted them if facts develop that differ significantly from the facts assumed when they were issued. In addition, the Utility often seeks periodic renewal of a license or permit, such as a waste discharge permit or a FERC operating license for a hydroelectric generation facility. If a license or permit is not renewed for a particular facility and the Utility is required to cease operations at that facility, the Utility could incur an impairment charge or other costs. Before renewing a permit or license, the issuing agency may impose additional requirements that may increase the Utility’s compliance costs. In particular, in connection with a license renewal for one or more of the Utility’s hydroelectric generation facilities or assets, the FERC may impose new license conditions that could, among other things, require increased expenditures or result in reduced electricity output and/or capacity at the facility. In addition, local governments may attempt to assert jurisdiction over various utility operations by requiring permits or other approvals that the Utility has not been previously required to obtain. The Utility may incur penalties and sanctions for failure to comply with the terms and conditions of licenses and permits which could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. If the Utility cannot obtain, renew, or comply with necessary governmental permits, authorizations, licenses, ordinances, or other requirements, or if the Utility cannot recover the increase in associated compliance and other costs in a timely manner, PG&E Corporation’s and the Utility’s financial results could be materially affected. Poor investment performance or other factors could require PG&E Corporation and the Utility to make significant unplanned contributions to its pension plan, other postretirement benefits plans, and nuclear decommissioning trusts. PG&E Corporation and the Utility provide defined benefit pension plans and other postretirement benefits for eligible employees and retirees. The Utility also maintains three trusts for the purposes of providing funds to decommission its nuclear facilities. The performance of the debt and equity markets affects the value of plan assets and trust assets. A decline in the market value may increase the funding requirements for these plans and trusts. The cost of providing pension and other postretirement benefits is also affected by other factors, including interest rates used to measure the required minimum funding levels, the rate of return on plan assets, employee demographics, discount rates used in determining future benefit obligations, rates of increase in health care costs, future government regulation, and prior contributions to the plans. Similarly, funding requirements for the nuclear decommissioning trusts are affected by the rates of return on trust assets, changes in the laws or regulations regarding nuclear decommissioning or decommissioning funding requirements as well as changes in assumptions or forecasts related to decommissioning dates, technology and the cost of labor, materials and equipment. (See Note 2: Summary of Significant Accounting Policies of the Notes to the Consolidated Financial Statements in Item 8.) If the Utility is required to make significant unplanned contributions to fund the pension and postretirement plans or if actual nuclear decommissioning costs exceed the amount of nuclear decommissioning trust funds and the Utility is unable to recover the contributions or additional costs in rates, PG&E Corporation’s and the Utility’s financial results could be materially affected. The Utility’s success depends on the availability of the services of a qualified workforce and its ability to maintain satisfactory collective bargaining agreements which cover a substantial number of employees. PG&E Corporation’s and the Utility’s results may suffer if the Utility is unable to attract and retain qualified personnel and senior management talent, or if prolonged labor disruptions occur. The Utility’s workforce is aging and many employees are or will become eligible to retire within the next few years. Although the Utility has undertaken efforts to recruit and train new field service personnel, the Utility may be faced with a shortage of experienced and qualified personnel. The majority of the Utility’s employees are covered by collective bargaining agreements with three unions. Labor disruptions could occur depending on the outcome of negotiations to renew the terms of these agreements with the unions or if tentative new agreements are not ratified by their members. In addition, some of the remaining non-represented Utility employees could join one of these unions in the future. PG&E Corporation and the Utility also may face challenges in attracting and retaining senior management talent especially if they are unable to restore the reputational harm generated by the negative publicity stemming from the ongoing enforcement proceedings. Any such occurrences could negatively impact PG&E Corporation’s and the Utility’s financial condition and results of operations. ITEM 1B.
Current §1A text (2017)
Show full section (14198 words)
ITEM 1A. RISK FACTORS PG&E Corporation’s and the Utility’s financial results can be affected by many factors, including estimates and assumptions used in the critical accounting policies described in MD&A, that can cause their actual financial results to differ materially from historical results or from anticipated future financial results. The following discussion of key risk factors should be considered in evaluating an investment in PG&E Corporation and the Utility and should be read in conjunction with MD&A and the Consolidated Financial Statements and related Notes in Part II, Item 8, “Financial Statements and Supplementary Data” of this Form 10-K. Any of these factors, in whole or in part, could materially affect PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, cash flows, and stock price. Risks Related to Wildfires PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by potential losses resulting from the impact of the Northern California wildfires. PG&E Corporation and the Utility also expect to be the subject of additional lawsuits and could be the subject of additional investigations, citations, fines or enforcement actions. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by potential losses resulting from the impact of the multiple wildfires that spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Del Norte, Lake, Nevada, and Yuba Counties, as well as in the area surrounding Yuba City, beginning on October 8, 2017 (the “Northern California wildfires”). According to the Cal Fire California Statewide Fire Summary dated October 30, 2017, at the peak of the wildfires, there were 21 major wildfires in California that, in total, burned over 245,000 acres, resulted in 43 fatalities, and destroyed an estimated 8,900 structures. Subsequently, the number of fatalities increased to 44. The Utility incurred $219 million in costs for service restoration and repair to the Utility’s facilities (including $97 million in capital expenditures) through December 31, 2017 in connection with these fires. While the Utility believes that such costs are recoverable through CEMA, its CEMA requests are subject to CPUC approval. The Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility is unable to recover such costs. The fires are being investigated by Cal Fire and the CPUC, including the possible role of the Utility’s power lines and other facilities. The Utility expects that Cal Fire will issue a report or reports stating its conclusions as to the sources of ignition of the fires and the ways that they progressed. The CPUC’s SED also is conducting investigations to assess the compliance of electric and communication companies’ facilities with applicable rules and regulations in fire impacted areas. According to information made available by the CPUC, investigation topics include, but are not limited to, maintenance of facilities, vegetation management, and emergency preparedness and response. Various other entities, including fire departments, may also be investigating certain of the fires. (For example, on February 3, 2018, it was reported that investigators with the Santa Rosa Fire Department had completed their investigation of two small fires that reportedly destroyed two homes and damaged one outbuilding and had concluded that the Utility’s facilities, along with high wind and other factors, contributed to those fires.) It is uncertain when the investigations will be complete and whether Cal Fire will release any preliminary findings before its investigation is complete. As of January 31, 2018, the Utility had submitted 22 electric incident reports to the CPUC associated with the Northern California wildfires where Cal Fire has identified a site as potentially involving the Utility’s facilities in its investigation and the property damage associated with each incident exceeded $50,000. The information contained in these reports is factual and preliminary, and does not reflect a determination of the causes of the fires. The investigations into the fires are ongoing. If the Utility’s facilities, such as its electric distribution and transmission lines, are determined to be the cause of one or more fires, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, interest, and attorneys’ fees without having been found negligent, which liability, in the aggregate, could be substantial and have a material adverse effect on PG&E Corporation and the Utility. (See “The doctrine of inverse condemnation, if applied by courts in litigation to which PG&E Corporation or the Utility are subject, could significantly expand the potential liabilities from such litigation and materially negatively affect PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows” below.) In addition to such claims for property damage, interest and attorneys’ fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, and other damages under other theories of liability, including if the Utility were found to have been negligent, which liability, in the aggregate, could be substantial and have a material adverse effect on PG&E Corporation and the Utility. Further, the Utility could be subject to material fines or penalties if the CPUC or any other law enforcement agency brought an enforcement action and determined that the Utility failed to comply with applicable laws and regulations. Given the preliminary stages of investigations and the uncertainty as to the causes of the fires, PG&E Corporation and the Utility do not believe a loss is probable at this time. However, it is reasonably possible that facts could emerge through the course of the various investigations that lead PG&E Corporation and the Utility to believe that a loss is probable, resulting in an accrued liability in the future, the amount of which could be material. PG&E Corporation and the Utility currently are unable to reasonably estimate the amount of losses (or range of amounts) that they could incur, given the preliminary stages of the investigations and the uncertainty regarding the extent and magnitude of potential damages. On January 31, 2018, the California Department of Insurance issued a press release announcing an update on property losses in connection with the October and December wildfires in California, stating that, as of such date, “insurers have received nearly 45,000 insurance claims totaling more than $11.79 billion in losses,” of which approximately $10 billion relates to statewide claims from the October 2017 wildfires. The remaining amount relates to claims from the Southern California December 2017 wildfires. According to the California Department of Insurance, as of the date of the press release, more than 21,000 homes, 3,200 businesses, and more than 6,100 vehicles, watercraft, farm vehicles, and other equipment were damaged or destroyed by the October 2017 wildfires. PG&E Corporation and the Utility have not independently verified these estimates. The California Department of Insurance did not state in its press release whether it intends to provide updated estimates of losses in the future. If the Utility’s facilities are determined to be the cause of one or more of the Northern California wildfires, PG&E Corporation and the Utility could be liable for the related property losses and other damages. The California Department of Insurance January 31, 2018 press release reflects insured property losses only. The press release does not account for uninsured losses, interest, attorneys’ fees, fire suppression costs, evacuation costs, medical expenses, personal injury and wrongful death damages or other costs. If the Utility were to be found liable for certain or all of such other costs and expenses, the amount of PG&E Corporation’s and the Utility’s liability could be higher than the approximately $10 billion estimated in respect of the wildfires that occurred in October 2017, depending on the extent of the damage in connection with such fire or fires. As a result, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. PG&E Corporation and the Utility also are the subject of a still increasing number of lawsuits that have been filed against PG&E Corporation and the Utility in Sonoma, Napa and San Francisco Counties’ Superior Courts, several of which seek to be certified as class actions. The lawsuits allege, among other things, negligence, inverse condemnation, trespass, and private nuisance. They principally assert that PG&E Corporation’s and the Utility’s alleged failure to maintain and repair their distribution and transmission lines and failure to properly maintain the vegetation surrounding such lines were the causes of the fires. The plaintiffs seek damages that include wrongful death, personal injury, property damage, evacuation costs, medical expenses, punitive damages, attorneys’ fees, and other damages. In addition, two derivative lawsuits for breach of fiduciary duties and unjust enrichment were filed in the San Francisco County Superior Court on November 16, 2017 and November 20, 2017, respectively. PG&E Corporation and the Utility expect to be the subject of additional lawsuits in connection with the Northern California wildfires. The wildfire litigation could take a number of years to be resolved because of the complexity of the matters, including the ongoing investigation into the causes of the fires and the growing number of parties and claims involved. The Utility has liability insurance from various insurers, which provides coverage for third-party liability attributable to the Northern California wildfires in an aggregate amount of approximately $800 million. If the Utility were to be found liable for one or more fires, the Utility’s insurance could be insufficient to cover that liability, depending on the extent of the damage in connection with such fire or fires. In addition, it could take a number of years before the Utility’s final liability is known and the Utility could apply for cost recovery. The Utility may be unable to recover costs in excess of insurance through regulatory mechanisms and, even if such recovery is possible, it could take a number of years to resolve and a number of years thereafter to collect. Further, SB 819, introduced in the California Senate in January 2018, if it becomes law, would prohibit utilities from recovering costs in excess of insurance resulting from damages caused by such utilities’ facilities, if the CPUC determines that the utility did not reasonably construct, maintain, manage, control, or operate the facilities. PG&E Corporation and the Utility have considered certain actions that might be taken to attempt to address liquidity needs of the business in such circumstances, but the inability to recover costs in excess of insurance through increases in rates and by collecting such rates in a timely manner, or any negative assessment by the Utility of the likelihood or timeliness of such recovery and collection, could have a material adverse effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. (See “If the Utility is unable to recover all or a significant portion of its excess costs in connection with the Northern California wildfires and the Butte fire through ratemaking mechanisms, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected” below.) Losses in connection with the wildfires would likely require PG&E Corporation and the Utility to seek financing, which may not be available on terms acceptable to PG&E Corporation or the Utility, or at all, when required. (See “Risks Related to Liquidity and Capital Requirements” below.) As of December 31, 2017, neither PG&E Corporation nor the Utility has accrued a liability with respect to the Northern California wildfires. If PG&E Corporation and the Utility were to determine that it is both probable that a loss has occurred and the amount of loss can be reasonably estimated, a liability would be recorded consistent with applicable accounting principles and as described in Note 13 of the Notes to the Consolidated Financial Statements in Item 8. As noted above, to the extent that such determination is made and a liability is accrued with respect to the Northern California wildfires, the amount of such liability accrual may be substantial. To the extent not offset by insurance recoveries determined to be similarly probable and estimable, the liability would reduce the balance sheet equity of PG&E Corporation and the Utility, which could adversely impact the Utility’s ability to maintain its CPUC-authorized capital structure of 52% equity and 48% debt and preferred stock, and which could also adversely impact PG&E Corporation’s and the Utility’s credit ratings and their ability to declare and pay dividends, efficiently raise capital, comply with financial covenants, and meet financial obligations. (See “PG&E Corporation’s and the Utility’s financial results will be affected by their ability to continue accessing the capital markets and by the terms of debt and equity financings” below.) Uncertainties relating to and market perception of these matters and the disclosure of findings regarding these matters over time, also could continue or increase volatility in the market for PG&E Corporation’s common stock and other securities, and for the securities of the Utility, and materially affect the price of such securities. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by the ultimate amount of third-party liability that the Utility incurs in connection with the Butte fire. In September 2015, a wildfire (known as the “Butte fire”) ignited and spread in Amador and Calaveras Counties in Northern California. On April 28, 2016, Cal Fire released its report of the investigation of the origin and cause of the wildfire. According to Cal Fire’s report, the fire burned 70,868 acres, resulted in two fatalities, destroyed 549 homes, 368 outbuildings and four commercial properties, and damaged 44 structures. Cal Fire’s report concluded that the wildfire was caused when a gray pine tree contacted the Utility’s electric line which ignited portions of the tree, and determined that the failure by the Utility and/or its vegetation management contractors, ACRT Inc. and Trees, Inc., to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree. In connection with the Butte fire, complaints have been filed against the Utility, currently involving approximately 3,770 individual plaintiffs representing approximately 2,030 households and their insurance companies. Plaintiffs seek to recover damages and other costs, principally based on the doctrine of inverse condemnation and negligence theory of liability. Plaintiffs also seek punitive damages. The number of individual complaints and plaintiffs may still increase in the future, because the statute of limitations for property damages in connection with the Butte fire has not yet expired. (The statute of limitations for personal injury in connection with the Butte fire has expired.) The Utility continues mediating and settling cases. In addition, on April 13, 2017, Cal Fire filed a complaint seeking to recover $87 million for its costs incurred in connection with the Butte fire, and in May 2017, the OES indicated that it intends to bring a claim against the Utility that the OES estimated in the approximate amount of $190 million. Also, in June 2017, the County of Calaveras indicated that it intends to bring a claim against the Utility that it estimates in the approximate amount of $85 million. In connection with this matter, the Utility may be liable for property damages, interest, and attorneys’ fees without having been found negligent, through the doctrine of inverse condemnation. In addition, the Utility may be liable for fire suppression costs, personal injury damages, and other damages if the Utility were found to have been negligent. While the Utility believes it was not negligent, there can be no assurance that a court or jury would agree with the Utility. The Utility currently believes that it is probable that it will incur a loss of at least $1.1 billion, increased from the $750 million previously estimated as of December 31, 2016 in connection with the Butte fire. While this amount includes the Utility’s assumptions about fire suppression costs (including its assessment of the Cal Fire loss), it does not include any significant portion of the estimated claims from the OES and the County of Calaveras. The Utility still does not have sufficient information to reasonably estimate the probable loss it may have for these additional claims. A change in management’s estimates or assumptions could result in an adjustment that could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. (See Note 13 to the Consolidated Financial Statements in Item 8.) If the Utility is unable to recover all or a significant portion of its excess costs in connection with the Northern California wildfires and the Butte Fire through ratemaking mechanisms, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Through December 31, 2017, the amounts accrued in connection with claims relating to the Butte fire have exceeded the Utility’s liability insurance coverage. While the Utility filed an application with the CPUC requesting approval to establish a WEMA to track wildfire expenses and to preserve the opportunity for the Utility to request recovery of wildfire costs that have not otherwise been recovered through insurance or other mechanisms, the Utility cannot predict the outcome of this proceeding. (See “Regulatory Matters - Application to Establish a Wildfire Expense Memorandum Account” in Item 7. MD&A.) In addition, there can be no assurance that the Utility will be allowed to recover costs recorded in WEMA, if approved, in the future. While the CPUC previously approved WEMA tracking accounts for San Diego Gas & Electric Company in 2010, in December 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it incurred as a result of the doctrine of inverse condemnation, holding that the inverse condemnation principles of strict liability are not relevant to the CPUC’s prudent manager standard. That determination is being challenged by San Diego Gas & Electric as well as by the Utility and Southern California Edison. Additionally, SB 819 introduced in the California Senate in January 2018, if it becomes law, would prohibit utilities’ recovery of costs in excess of insurance resulting from damages caused by such utilities’ facilities, if the CPUC determines that the Utility did not reasonably construct, maintain, manage, control, or operate the facilities. PG&E Corporation and the Utility have considered certain actions that might be taken to attempt to address liquidity needs of the business in such circumstances, but the inability to recover all or a significant portion of costs in excess of insurance through increases in rates and by collecting such rates in a timely manner, or any negative assessment by the Utility of the likelihood or timeliness of such recovery and collection, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The doctrine of inverse condemnation, if applied by courts in litigation to which PG&E Corporation or the Utility are subject, could significantly expand the potential liabilities from such litigation and materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. California law includes a doctrine of inverse condemnation that is routinely invoked in California for wildfire damages. Inverse condemnation imposes strict liability (including liability for attorneys’ fees) for damages as a result of the design, construction and maintenance of utility facilities, including utilities’ electric transmission lines. Courts have imposed liability under the doctrine of inverse condemnation in legal actions brought by property holders against utilities on the grounds that losses borne by the person whose property was damaged through a public use undertaking should be spread across the community that benefitted from such undertaking, and based on the assumption that utilities have the ability to recover these costs from their customers. Plaintiffs have asserted the doctrine of inverse condemnation in lawsuits related to the Northern California and Butte fires, and it is possible that plaintiffs could be successful in convincing courts to apply this doctrine in these or other litigations. For example, on June 22, 2017, the Superior Court for the County of Sacramento found that the doctrine of inverse condemnation applies to the Utility with respect to the Butte fire. Although the Utility has filed a renewed motion for a legal determination of inverse condemnation liability, there can be no assurance that the Utility will be successful in its arguments that the doctrine of inverse condemnation does not apply in the Butte fire or other litigation against PG&E Corporation or the Utility. Furthermore, a court could determine that the doctrine of inverse condemnation applies even in the absence of an open CPUC proceeding for cost recovery, or before a potential cost recovery decision is issued by the CPUC. Although the imposition of liability is premised on the assumption that utilities have the ability to automatically recover these costs from their customers, there can be no guarantee that the CPUC would authorize cost recovery whether or not a previous court decision imposes liability on a utility under the doctrine of inverse condemnation. In December 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it incurred as a result of the doctrine of inverse condemnation, holding that the inverse condemnation principles of strict liability are not relevant to the CPUC’s prudent manager standard. That determination is being challenged by San Diego Gas & Electric as well as by the Utility and Southern California Edison. If PG&E Corporation or the Utility were to be found liable for damage under the doctrine of inverse condemnation, but is unable to secure a cost recovery decision from the CPUC to pay for such costs through increases in rates, the financial condition, results of operations, liquidity and cash flows of PG&E Corporation and the Utility would be materially affected by potential losses resulting from the impact of the Northern California wildfires. (See “PG&E Corporation and the Utility also expect to be the subject of additional lawsuits and could be the subject of additional investigations, citations, fines or enforcement actions” and “PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected by the ultimate amount of third-party liability that the Utility incurs in connection with the Butte fire” above.) Risks Related to the Outcome of Other Enforcement Matters, Investigations, and Regulatory Proceedings The Utility is subject to extensive regulations and the risk of enforcement proceedings in connection with such regulations, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by the outcomes of the CPUC’s investigative enforcement proceedings against the Utility, other known enforcement matters, and other ongoing state and federal investigations and requests for information. The Utility could incur material costs and fines in connection with compliance with penalties from closed investigations or enforcement actions or in connection with future investigations, citations, audits, or enforcement actions. The Utility is subject to extensive regulations, including federal, state and local energy, environmental and other laws and regulations, and the risk of enforcement proceedings in connection with such regulations. The Utility could incur material charges, including fines and other penalties, in connection with the ex parte OII, safety culture OII, and the CPUC’s SED investigations, including the SED’s investigations of the Yuba City incident, which arose from a residential structure fire in Yuba City, California, in January 2017, that resulted in the collapse of a house and injuries to two persons inside the house, or other current and future investigations. The SED could launch investigations at any time on any issue it deems appropriate. The SED has discretion whether to issue a penalty for each violation, but if it assesses a penalty for a violation, it is required to impose the maximum statutory penalty of $50,000, with an administrative limit of $8 million per citation issued. The SED may, at its discretion, impose penalties on a daily basis, or on less than a daily basis, for violations that continued for more than one day. The SED also has wide discretion to determine the amount of penalties based on the totality of the circumstances, including such factors as the gravity of the violations; the type of harm caused by the violations and the number of persons affected; and the good faith of the entity charged in attempting to achieve compliance, after notification of a violation. The SED also is required to consider the appropriateness of the amount of the penalty to the size of the entity charged. Historically, the SED has exercised broad discretion in determining whether violations are continuing and the amount of penalties to be imposed. While it is uncertain how the CPUC will calculate the number of violations or the penalty for any violations, such fines or penalties could be significant and materially affect PG&E Corporation’s and the Utility’s liquidity and results of operations. (See Note 13 to the Consolidated Financial Statements in Item 8.) The Utility also is a target of a number of investigations. In 2014, both the U.S. Attorney's Office in San Francisco and the California Attorney General's office opened investigations into matters related to allegedly improper communication between the Utility and CPUC personnel. The Utility also is unable to predict the outcome of, or costs and expenses associate with, pending investigations, including whether any charges will be brought against the Utility. If these investigations result in enforcement action against the Utility, the Utility could incur additional fines or penalties and, in the event of a judgment against the Utility, suffer further ongoing negative consequences. For example, on April 9, 2015, the CPUC issued a decision in its investigative enforcement proceedings against the Utility to impose total penalties of $1.6 billion on the Utility after determining that the Utility had committed numerous violations of laws and regulations related to its natural gas transmission operations (the “San Bruno Penalty Decision”). The San Bruno Penalty Decision requires the SED to review the Utility’s gas transmission operations (including the Utility’s compliance with the remedies ordered by the San Bruno Penalty Decision) and to perform annual audits of the Utility’s record-keeping practices for a minimum of ten years. The SED could impose fines on the Utility or require the Utility to incur unrecoverable costs, or both, based on the outcome of these future audits. Furthermore, a negative outcome in any of these investigations, or future enforcement actions, could negatively affect the outcome of future ratemaking and regulatory proceedings to which the Utility may be subject; for example, by enabling parties to challenge the Utility’s request to recover costs that the parties allege are somehow related to the Utility’s violations. (See also “PG&E Corporation’s and the Utility’s future financial results could be materially affected by the conviction of the Utility in the federal criminal proceeding and by the debarment proceeding” below.) The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and resource adequacy requirements; customer billing; customer service; affiliate transactions; vegetation management; design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC general orders or other applicable CPUC decisions or regulations; federal electric reliability standards; and environmental compliance. For example, despite the Utility’s system-wide survey of its transmission pipelines, carried out in an effort to address a self-reported violation whereby the Utility did not properly identify encroachments (such as building structures and vegetation overgrowth) on the Utility’s pipeline rights-of-way, the SED could impose fines on the Utility in the future based on the Utility’s failure to continuously survey its system and remove encroachments. CPUC staff could also impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected in the event of non-compliance with the terms of probation and by the outcome of the debarment proceeding. On August 9, 2016, the jury in the federal criminal trial against the Utility in the United States District Court for the Northern District of California, in San Francisco, found the Utility guilty on one count of obstructing a federal agency proceeding and five counts of violations of pipeline integrity management regulations of the Natural Gas Pipeline Safety Act. On January 26, 2017, the court issued a judgment of conviction against the Utility. The court sentenced the Utility to a five-year corporate probation period, oversight by a third-party monitor for a period of five years, with the ability to apply for early termination after three years, a fine of $3 million to be paid to the federal government, certain advertising requirements, and community service. The probation includes a requirement that the Utility not commit any local, state, or federal crimes during the probation period. As part of the probation, the Utility has retained a third-party monitor at the Utility’s expense. The goal of the monitor is to help ensure that the Utility takes reasonable and appropriate steps to maintain the safety of its gas and electric operations, and to maintain effective ethics, compliance and safety related incentive programs on a Utility-wide basis. The Utility could incur material costs and additional penalties, not recoverable through rates, in the event of non-compliance with the terms of its probation and in connection with the monitorship (including but not limited to costs resulting from recommendations of the monitor). Since 2015, the Utility has also been the subject of a DOI inquiry into whether the Utility should be suspended or debarred from entering into federal procurement and non-procurement contracts and programs, citing the San Bruno explosion, and indicating, as the basis for the inquiry, alleged poor record-keeping, poor identification and evaluation of threats to gas lines and obstruction of the NTSB’s investigation. On December 21, 2016, the Utility and the DOI entered into an interim administrative agreement that reflects the DOI’s determination that the Utility remains eligible to contract with federal government agencies while the DOI determines whether any further action is necessary to protect the federal government’s business interests. If the DOI determines that the Utility’s compliance and ethics program is not generally effective in preventing and detecting criminal conduct, the Utility may be required to enter into an amended administrative agreement and implement remedial and other measures, such as a requirement that the Utility’s natural gas operations and/or compliance and ethics programs be supervised by one or more independent third-party monitor(s). The Utility’s conviction and the outcome of probation and the debarment proceeding could harm the Utility’s relationships with regulators, legislators, communities, business partners, or other constituencies and make it more difficult to recruit qualified personnel and senior management. Further, they could negatively affect the outcome of future ratemaking and regulatory proceedings, for example, by enabling parties to argue that the Utility should not be allowed to recover costs that the parties allege are somehow related to the criminal charges on which the Utility was found guilty. They could also result in increased regulatory or legislative scrutiny with respect to various aspects of how the Utility’s business is conducted or organized. (See “Enforcement and Litigation Matters” in Item 7. MD&A.) PG&E Corporation’s and the Utility’s financial results primarily depend on the outcomes of regulatory and ratemaking proceedings and the Utility’s ability to manage its operating expenses and capital expenditures so that it is able to earn its authorized rate of return in a timely manner. As a regulated entity, the Utility’s rates are set by the CPUC or the FERC on a prospective basis and are generally designed to allow the Utility to collect sufficient revenues to recover reasonable costs of providing service, including a return on its capital investments. PG&E Corporation’s and the Utility’s financial results could be materially affected if the CPUC or the FERC does not authorize sufficient revenues for the Utility to safely and reliably serve its customers and earn its authorized ROE. The outcome of the Utility’s ratemaking proceedings can be affected by many factors, including the level of opposition by intervening parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of the Utility’s regulators, consumer and other stakeholder organizations, and customers, about the Utility’s ability to provide safe, reliable, and affordable electric and gas services. Further, the increasing amount of Reliability Must Run (“RMR”) electric generation in the CAISO could increase the Utility’s costs of procuring capacity needed for reliable service to its customers. In addition to the amount of authorized revenues, PG&E Corporation’s and the Utility’s financial results could be materially affected if the Utility’s actual costs to safely and reliably serve its customers differ from authorized or forecast costs. The Utility may incur additional costs for many reasons including changing market circumstances, unanticipated events (such as storms, fires, accidents, or catastrophic or other events affecting the Utility’s operations), or compliance with new state laws or policies. Although the Utility may be allowed to recover some or all of the additional costs, there may be a substantial time lag between when the Utility incurs the costs and when the Utility is authorized to collect revenues to recover such costs. Alternatively, the CPUC or the FERC may disallow costs that they determine were not reasonably or prudently incurred by the Utility. The Utility also is required to incur costs to comply with legislative and regulatory requirements and initiatives, such as those relating to the development of a state-wide electric vehicle charging infrastructure, the deployment of distributed energy resources, implementation of demand response and customer energy efficiency programs, energy storage and renewable energy targets, underground gas storage, and the construction of the California high-speed rail project. The Utility’s ability to recover costs, including its investments, associated with these and other legislative and regulatory initiatives will, in large part, depend on the final form of legislative or regulatory requirements, and whether the associated ratemaking mechanisms can be timely adjusted to reflect a lower customer demand for the Utility’s electricity and natural gas services. PG&E Corporation’s and the Utility’s financial results depend upon the Utility’s continuing ability to recover “pass-through” costs, including electricity and natural gas procurement costs, from customers in a timely manner. The CPUC may disallow procurement costs for a variety of reasons. In addition, the Utility’s ability to recover these costs could be affected by the loss of Utility customers and decreased new customer growth, if the CPUC fails to adjust the Utility’s rates to reflect such events. The Utility meets customer demand for electricity from a variety of sources, including electricity generated from the Utility’s own generation facilities, electricity provided by third parties under power purchase agreements, and purchases on the wholesale electricity market. The Utility must manage these sources using the commercial and CPUC regulatory principles of “least cost dispatch” and prudent administration of power purchase agreements in compliance with its CPUC-approved long-term procurement plan. The CPUC could disallow procurement costs incurred by the Utility if the CPUC determines that the Utility did not comply with these principles or if the Utility did not comply with its procurement plan. Further, the contractual prices for electricity under the Utility’s current or future power purchase agreements could become uneconomic in the future for a variety of reasons, including developments in alternative energy technology, increased self-generation by customers, an increase in distributed generation, and lower customer demand due to adverse economic conditions or the loss of the Utility’s customers to other retail providers. In particular, the Utility will incur additional costs to procure renewable energy to meet the higher targets established by California SB 350 that became effective on January 1, 2016. Despite the CPUC’s current approval of the contracts, the CPUC could disallow contract costs in the future if it determines that the terms of such contracts, including price, do not meet the CPUC reasonableness standard. The Utility’s ability to recover the costs it incurs in the wholesale electricity market may be affected by whether the CAISO wholesale electricity market continues to function effectively. Although market mechanisms are designed to limit excessive prices, these market mechanisms could fail, or the related systems and software on which the market mechanisms rely may not perform as intended which could result in excessive market prices. The CPUC could prohibit the Utility from passing through the higher costs of electricity to customers. For example, during the 2000 and 2001 energy crisis, the market mechanism flaws in California’s then-newly established wholesale electricity market led to dramatically high market prices for electricity that the Utility was unable to recover through customer rates, ultimately causing the Utility to file a petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code. Further, PG&E Corporation’s and the Utility’s financial results could be affected by the loss of Utility customers and decreasing bundled load that occurs through municipalization of the Utility’s facilities, an increase in the number of CCAs who provide electricity to their residents, and an increase in the number of consumers who become direct access customers of alternative generation providers. (See “Competition in the Electricity Industry” in Item 1.) As the number of bundled customers (i.e., those customers who receive electricity and distribution service from the Utility) declines, the rates for remaining customers could increase as the Utility would have a smaller customer base from which to recover certain procurement costs. Although the Utility is permitted to collect non-bypassable charges for above market generation-related costs incurred on behalf of former customers, the charges may not be sufficient for the Utility to fully recover these costs. In addition, the Utility’s ability to collect non-bypassable charges has been, and may continue to be, challenged by certain customer groups. Furthermore, if the former customers return to receiving electricity supply from the Utility, the Utility could incur costs to meet their electricity needs that it may not be able to timely recover through rates or that it may not be able to recover at all. In addition, increasing levels of self-generation of electricity by customers (primarily solar installations) and the use of customer NEM, which allows self-generating customers to receive bill credits for surplus power at the full retail rate, puts upward rate pressure on remaining customers. New rules and rates became effective for new NEM customers of the Utility in December 2016. New NEM customers are required to pay an interconnection fee, comply with time of use rates, and are required to pay certain non-bypassable charges to help fund some of the costs of low income, energy efficiency, and other programs that other customers pay. Remaining customers may incur significantly higher bills due to an increase in customers seeking alternative energy providers. The CPUC has indicated that it intends to revisit these rules in 2019. A confluence of technology-related cost declines and sustained federal or state subsidies could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility’s bundled electric service which could further threaten the Utility’s ability to recover its generation, transmission, and distribution investments. If the number of the Utility’s customers decreases or grows at a slower rate than anticipated, the Utility’s level of authorized capital investment could decline as well, leading to a slower growth in rate base and earnings. Reduced energy demand or significantly slowed growth in demand due to customer migration to other energy providers, adoption of energy efficient technology, conservation, increasing levels of distributed generation and self-generation, unless substantially offset through regulatory cost allocations, could materially affect PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, and cash flows. The CPUC has begun to implement rate reform to allow residential electric rates to more closely reflect the utilities’ actual costs of providing service and decrease cross-subsidization among customer classes. Many aspects of rate reform are not yet finalized, including time-of-use rates and whether the utilities can impose a fixed charge on certain customers. Further, changes in commodity prices also may have an adverse effect on the Utility’s ability to timely recover its operating costs and earn its authorized ROE. Although the Utility generally recovers its electricity and natural gas procurement costs from customers as “pass-through” costs, a significant and sustained rise in commodity prices could create overall rate pressures that make it more difficult for the Utility to recover its costs that are not categorized as “pass-through” costs. To relieve some of this upward rate pressure, the CPUC could authorize lower revenues than the Utility requested or disallow full cost recovery. If the Utility is unable to recover a material portion of its procurement costs and/or if the CPUC fails to adjust the Utility’s rates to reflect the impact of changing loads, the wide deployment of distributed generation, and the development of new electricity generation and energy storage technologies, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Risks Related to Liquidity and Capital Requirements The outcome or market perception of the investigations and litigation in connection with the Northern California wildfires, and the outcome or market perception of other litigation and enforcement matters, could reduce or eliminate PG&E Corporation’s and the Utility’s access to the capital markets and other sources of financing, which could have a material adverse effect on PG&E Corporation and the Utility. PG&E Corporation’s and the Utility’s liquidity is dependent on many factors, including access to the capital markets and availability under their revolving credit facilities and commercial paper programs. PG&E Corporation’s and the Utility’s ability to access the capital markets, the ability to borrow under their loan financing arrangements, including their revolving credit facilities, and the terms and rates of future financings, as well as the credit ratings of PG&E Corporation and the Utility and their respective debt facilities, could be materially affected by the outcome or market perception of the matters discussed in this 2017 Form 10-K under “Northern California Wildfires” in Note 13 of the Notes to the Consolidated Financial Statements in Item 8. Liabilities that could be incurred as a result of the Northern California wildfires could adversely affect their ability to comply with the covenants in their financing arrangements, which could adversely affect the ability to borrow under the applicable facility or program. Access by PG&E Corporation to the equity capital markets is also critical to maintaining the Utility’s CPUC-authorized capital structure. PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. In the fiscal year ended December 31, 2017, PG&E Corporation issued $416 million in common stock and made equity contributions of $455 million to the Utility. PG&E Corporation forecasts it will need a material amount of equity in future years, including to support the Utility’s capital expenditures. PG&E Corporation may also seek to issue additional equity to fund unrecoverable operating expenses and to pay claims, losses, fines and penalties that may be required by the outcome of enforcement matters and litigation, including in connection with the Northern California wildfires, and the outcome of the related CPUC and Cal Fire investigations. If either PG&E Corporation or the Utility is unable to access the capital markets or to borrow under their respective loan financing arrangements or commercial paper programs, PG&E Corporation and the Utility’s financial condition, results of operations, liquidity, and cash flows, could be materially affected. PG&E Corporation’s and the Utility’s ability to meet their debt service and other financial obligations and their ability to pay dividends depend on the Utility’s earnings and cash flows. In addition, in December 2017, the Boards of Directors suspended dividends on PG&E Corporation’s common stock and the Utility’s preferred stock, as a result of which the price of PG&E Corporation’s common stock and the ability of PG&E Corporation and the Utility to raise equity capital could be adversely affected. PG&E Corporation is a holding company with no revenue generating operations of its own. The Utility must use its resources to satisfy its own obligations, including the Utility’s obligation to serve customers, to pay principal and interest on outstanding debt, to pay preferred stock dividends, unless suspended, and meet its obligations to employees and creditors, before it can distribute cash to PG&E Corporation. Under the CPUC’s rules applicable to utility holding companies, the Utility’s dividend policy must be established by the Utility’s Board of Directors as though the Utility were a stand-alone utility company and PG&E Corporation’s Board of Directors must give “first priority” to the Utility’s capital requirements, as determined to be necessary and prudent to meet the Utility’s obligation to serve or to operate the Utility in a prudent and efficient manner. The CPUC has interpreted this “first priority” obligation to include the requirement that PG&E Corporation “infuse the Utility with all types of capital necessary for the Utility to fulfill its obligation to serve.” In addition, before the Utility can pay common stock dividends to PG&E Corporation, the Utility must maintain its authorized capital structure with an average 52% equity component. If the Utility were required to pay a material amount of fines or incur material unrecoverable costs in connection with the Northern California wildfires, the Butte fire, the pending CPUC investigations, the terms of probation or monitorship, or other liabilities or enforcement matters, it would require incremental equity contributions from PG&E Corporation to restore its capital structure. PG&E Corporation common stock issuances used to fund such equity contributions could materially dilute earnings per share. (See “Liquidity and Financial Resources” in Item 7. MD&A). Further, if PG&E Corporation were required to infuse the Utility with significant capital or if the Utility were unable to distribute cash to PG&E Corporation, or both, PG&E Corporation may be unable to pay principal and interest on its outstanding debt, pay its common stock dividend or meet other obligations. In December 2017, the Boards of Directors of PG&E Corporation and the Utility suspended dividends on common stock of PG&E Corporation and preferred stock of the Utility due to uncertainty related to the causes and potential liabilities associated with the Northern California wildfires. The suspension of dividends could continue to materially affect the price of PG&E Corporation’s common stock and adversely affect the ability of PG&E Corporation to raise additional equity capital. There can be no assurances as to when, if at all, the Board of Directors of PG&E Corporation and the Utility will determine to re-instate quarterly cash dividends on PG&E Corporation’s common stock or the Utility’s preferred stock. PG&E Corporation’s and the Utility’s financial results will be affected by their ability to continue accessing the capital markets and by the terms of debt and equity financings. PG&E Corporation and the Utility will continue to seek funds in the capital and credit markets to enable the Utility to make capital investments, and to pay fines that may be imposed in the future, as well as costs related to rights-of-way and legal and regulatory costs. PG&E Corporation’s and the Utility’s ability to access the capital and credit markets and the costs and terms of available financing depend primarily on PG&E Corporation’s and the Utility’s credit ratings and outlook. Their credit ratings and outlook can be affected by many factors, including pending or anticipated litigation, the pending Cal Fire and CPUC investigations and CPUC ratemaking proceedings, and by the December 20, 2017 decision of the Boards of Directors of PG&E Corporation and the Utility to suspend dividends, as well as the perceived impact of all such matters on PG&E Corporation’s and the Utility’s financial condition, whether or not such perception is accurate. On December 21, 2017, Moody's Investor Services and on December 22, 2017, Standard & Poor’s Global Ratings, each placed all of the ratings of PG&E Corporation and the Utility under review for downgrade, and Standard & Poor’s Global Ratings additionally lowered its ratings on the Utility’s preferred stock. If PG&E Corporation’s or the Utility’s credit ratings were to be downgraded or the ratings on the Utility’s preferred stock are further downgraded, in particular to below investment grade, their ability to access the capital and credit markets would be negatively affected and could result in higher borrowing costs, fewer financing options, including reduced, or lack of, access to the commercial paper market and additional collateral posting requirements, which in turn could affect liquidity and lead to an increased financing need. Other factors can affect the availability and terms of debt and equity financing, including changes in the federal or state regulatory environment affecting energy companies generally or PG&E Corporation and the Utility in particular, the overall health of the energy industry, an increase in interest rates by the Federal Reserve Bank, and general economic and financial market conditions. The reputations of PG&E Corporation and the Utility continue to suffer from the negative publicity about matters discussed under “Enforcement and Litigation Matters” in Item 3. Legal Proceedings and Note 13 of the Notes to the Consolidated Financial Statements in Item 8. The negative publicity and the uncertainty about the outcomes of these matters may undermine confidence in management’s ability to execute its business strategy and restore a constructive regulatory environment, which could adversely impact PG&E Corporation’s stock price. Further, the market price of PG&E Corporation common stock could decline materially depending on the outcome of these matters. The amount and timing of future share issuances also could affect the stock price. Risks Related to Operations and Information Technology The Utility’s electricity and natural gas operations are inherently hazardous and involve significant risks which, if they materialize, can adversely affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The Utility owns and operates extensive electricity and natural gas facilities, including two nuclear generation units and an extensive hydroelectric generating system. (See “Electric Utility Operations” and “Natural Gas Utility Operations” in Item 1. Business.) The Utility’s ability to earn its authorized ROE depends on its ability to efficiently maintain, operate, and protect its facilities, and provide electricity and natural gas services safely and reliably. The Utility undertakes substantial capital investment projects to construct, replace, and improve its electricity and natural gas facilities. In addition, the Utility is obligated to decommission its electricity generation facilities at the end of their useful operating lives, and the CPUC approved retirement of Diablo Canyon by 2024 and 2025. The Utility’s ability to safely and reliably operate, maintain, construct and decommission its facilities is subject to numerous risks, many of which are beyond the Utility’s control, including those that arise from: the breakdown or failure of equipment, electric transmission or distribution lines, or natural gas transmission and distribution pipelines, that can cause explosions, fires, or other catastrophic events; an overpressure event occurring on natural gas facilities due to equipment failure, incorrect operating procedures or failure to follow correct operating procedures, or welding or fabrication-related defects, that results in the failure of downstream transmission pipelines or distribution assets and uncontained natural gas flow; the failure to maintain adequate capacity to meet customer demand on the gas system that results in customer curtailments, controlled/uncontrolled gas outages, gas surges back into homes, serious personal injury or loss of life; a prolonged statewide electrical black-out that results in damage to the Utility’s equipment or damage to property owned by customers or other third parties; the failure to fully identify, evaluate, and control workplace hazards that result in serious injury or loss of life for employees or the public, environmental damage, or reputational damage; the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act; the failure of a large dam or other major hydroelectric facility, or the failure of one or more levees that protect land on which the Utility’s assets are built; the failure to take expeditious or sufficient action to mitigate operating conditions, facilities, or equipment, that the Utility has identified, or reasonably should have identified, as unsafe, which failure then leads to a catastrophic event (such as a wild land fire or natural gas explosion); inadequate emergency preparedness plans and the failure to respond effectively to a catastrophic event that can lead to public or employee harm or extended outages; operator or other human error; an ineffective records management program that results in the failure to construct, operate and maintain a utility system safely and prudently; construction performed by third parties that damages the Utility’s underground or overhead facilities, including, for example, ground excavations or “dig-ins” that damage the Utility’s underground pipelines; the release of hazardous or toxic substances into the air, water, or soil, including, for example, gas leaks from natural gas storage facilities; flaking lead-based paint from the Utility’s facilities, and leaking or spilled insulating fluid from electrical equipment; and attacks by third parties, including cyber-attacks, acts of terrorism, vandalism, or war. The occurrence of any of these events could interrupt fuel supplies; affect demand for electricity or natural gas; cause unplanned outages or reduce generating output; damage the Utility’s assets or operations; damage the assets or operations of third parties on which the Utility relies; damage property owned by customers or others; and cause personal injury or death. As a result, the Utility could incur costs to purchase replacement power, to repair assets and restore service, and to compensate third parties. Further, although the Utility often enters into agreements for third-party contractors to perform work, such as patrolling and inspection of facilities or the construction or demolition or facilities, the Utility may retain liability for the quality and completion of the contractor’s work and can be subject to penalties or other enforcement action if the contractor violates applicable laws, rules, regulations, or orders. The Utility may also be subject to liability, penalties or other enforcement action as a result of personal injury or death caused by third-party contractor actions. Insurance, equipment warranties, or other contractual indemnification requirements may not be sufficient or effective to provide full or even partial recovery under all circumstances or against all hazards or liabilities to which the Utility may become subject. An uninsured loss could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The Utility’s insurance coverage may not be sufficient to cover losses caused by an operating failure or catastrophic events, including severe weather events, or may not be available at a reasonable cost, or available at all. The Utility has experienced increased costs and difficulties in obtaining insurance coverage for wildfires that could arise from the Utility’s ordinary operations. PG&E Corporation, the Utility or its contractors and customers may experience coverage reductions and/or increased wildfire insurance costs in future years. No assurance can be given that future losses will not exceed the limits of the Utility’s insurance coverage. Uninsured losses and increases in the cost of insurance may not be recoverable in customer rates. A loss which is not fully insured or cannot be recovered in customer rates could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. As a result of the potential application of a strict liability standard under the doctrine of inverse condemnation, recent losses recorded by insurance companies, the risk of increase of wildfires including as a result of the ongoing drought, the Northern California wildfires, and the Butte fire, the Utility may not be able to obtain sufficient insurance coverage in the future at comparable cost and terms as the Utility’s current insurance coverage, or at all. In addition, the Utility is unable to predict whether it would be allowed to recover in rates the increased costs of insurance or the costs of any uninsured losses. Future insurance coverage may not be available at rates and on terms as favorable as the Utility’s current insurance coverage or may not be available at all. If the amount of insurance is insufficient or otherwise unavailable, or if the Utility is unable to recover in rates the costs of any uninsured losses, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The electric power industry is undergoing significant change driven by technological advancements and a decarbonized economy, which could materially impact the Utility’s operations, financial condition, and results of operations. The electric power industry is undergoing transformative change driven by technological advancements enabling customer choice (for example, customer-owned generation and energy storage) and state climate policy supporting a decarbonized economy. California's environmental policy objectives are accelerating the pace and scope of the industry change. The electric grid is a critical enabler of the adoption of new energy technologies that support California's climate change and GHG reduction objectives, which continue to be publicly supported by California policymakers notwithstanding a recent change in the federal approach to such matters. California utilities are experiencing increasing deployment by customers and third parties of DERs, such as on-site solar generation, energy storage, fuel cells, energy efficiency, and demand response technologies. This growth will require modernization of the electric distribution grid to, among other things, accommodate two-way flows of electricity, increase the grid's capacity, and interconnect DERs. In order to enable the California clean energy economy, sustained investments are required in grid modernization, renewable integration projects, energy efficiency programs, energy storage options, EV infrastructure and state infrastructure modernization (e.g. rail and water projects). To this end, the CPUC is conducting proceedings to: evaluate changes to the planning and operation of the electric distribution grid in order to prepare for higher penetration of DERs; consider future grid modernization and grid reinforcement investments; evaluate if traditional grid investments can be deferred by DERs, and if feasible, what, if any, compensation to utilities would be appropriate for enabling those investments; and clarify the role of the electric distribution grid operator. The CPUC has also recently opened proceedings regarding the creation of a shared database or statewide census of utility poles and conduits in California and increased access by communications providers to utility rights-of-way. This proceeding could require utilities to invest significant resources into inspecting poles and conduits, limit available capacity in existing rights-of-way, or impose other requirements on utilities facilities. The Utility is unable to predict the outcome of these proceedings. In addition, the CPUC has held discussions on potential changes to California’s electricity market. On May 19, 2017, California energy companies, along with other stakeholders, discussed customer choice and the future of the state’s electricity industry at a CPUC “en banc” meeting. Specifically, the goal of the “en banc” was to frame a discussion on the trends that are driving change within California’s electricity sector and overall clean-energy economy and to lay out elements of a path forward to ensure that California achieves its reliability, affordability, equity, and carbon reduction imperatives while recognizing the important role that technology and customer preferences will play in shaping this future. While the CPUC had indicated its intent to open a proceeding related to customer choice, the Utility is unable to predict whether that remains the CPUC’s intent or the timing of any such proceeding. The industry change, costs associated with complying with new regulatory developments and initiatives and with technological advancements, or the Utility’s inability to successfully adapt to changes in the electric industry, could materially affect the Utility’s operations, financial condition, and results of operations. A cyber incident, cyber security breach, severe natural event or physical attack on the Utility’s operational networks and information technology systems could have a material effect on its business, financial condition, results of operations, liquidity, and cash flows. The Utility’s electricity and natural gas systems rely on a complex, interconnected network of generation, transmission, distribution, control, and communication technologies, which can be damaged by natural events-such as severe weather or seismic events-and by malicious events, such as cyber and physical attacks. Private and public entities, such as the North American Electric Reliability Corporation, and U.S. Government Departments, including the Departments of Defense, Homeland Security and Energy, and the White House, have noted that cyber-attacks targeting utility systems are increasing in sophistication, magnitude, and frequency. The Utility’s operational networks also may face new cyber security risks due to modernizing and interconnecting the existing infrastructure with new technologies and control systems. Any failure or decrease in the functionality of the Utility’s operational networks could cause harm to the public or employees, significantly disrupt operations, negatively impact the Utility’s ability to safely generate, transport, deliver and store energy and gas or otherwise operate in the most safe and efficient manner or at all, and damage the Utility’s assets or operations or those of third parties. The Utility also relies on complex information technology systems that allow it to create, collect, use, disclose, store and otherwise process sensitive information, including the Utility’s financial information, customer energy usage and billing information, and personal information regarding customers, employees and their dependents, contractors, and other individuals. In addition, the Utility often relies on third-party vendors to host, maintain, modify, and update its systems, and to provide other services to the Utility or the Utility’s customers. These third-party vendors could cease to exist, fail to establish adequate processes to protect the Utility’s systems and information, or experience security incidents or inadequate security measures. Any incidents or disruptions in the Utility’s information technology systems could impact the Utility’s ability to track or collect revenues and to maintain effective internal controls over financial reporting. The Utility and its third party vendors have been subject to, and will likely continue to be subject to attempts to gain unauthorized access to the Utility’s information technology systems or confidential data (including information about customers and employees), or to disrupt the Utility’s operations. None of these attempts or breaches has individually or in the aggregate resulted in a security incident with a material impact on PG&E Corporation’s and the Utility’s financial condition and results of operations. Despite implementation of security and control measures, there can be no assurance that the Utility will be able to prevent the unauthorized access to its operational networks, information technology systems or data, or the disruption of its operations. Such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, penalties for violation of applicable privacy laws, investigations, and regulatory actions that could result in fines and penalties, loss of customers and harm to PG&E Corporation’s and the Utility’s reputation, any of which could have a material adverse effect on PG&E Corporation’s and the Utility’s financial condition and results of operations. The Utility maintains cyber liability insurance that covers certain damages caused by cyber incidents. However, there is no guarantee that adequate insurance will continue to be available at rates the Utility believes are reasonable or that the costs of responding to and recovering from a cyber incident will be covered by insurance or recoverable in rates. The operation and decommissioning of the Utility’s nuclear generation facilities expose it to potentially significant liabilities and the Utility may not be able to fully recover its costs if regulatory requirements change or the plant ceases operations before the licenses expire. The operation of the Utility’s nuclear generation facilities exposes it to potentially significant liabilities from environmental, health and financial risks, such as risks relating to the storage, handling and disposal of spent nuclear fuel, and the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act. If the Utility incurs losses that are either not covered by insurance or exceed the amount of insurance available, such losses could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the Utility may be required under federal law to pay up to $255 million of liabilities arising out of each nuclear incident occurring not only at the Utility’s Diablo Canyon facility but at any other nuclear power plant in the United States. (See Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) On January 11, 2018, the CPUC approved the retirement of Diablo Canyon units by 2024 and 2025. However, the Utility continues to face public concern about the safety of nuclear generation and nuclear fuel. Some of these nuclear opposition groups regularly file petitions at the NRC and in other forums challenging the actions of the NRC and urging governmental entities to adopt laws or policies in opposition to nuclear power. Although an action in opposition may ultimately fail, regulatory proceedings may take longer to conclude and be more costly to complete. It is also possible that public pressure could grow leading to adverse changes in legislation, regulations, orders, or their interpretation. As a result, operations at the Utility’s two nuclear generation units at Diablo Canyon could cease before their respective licenses expire in 2024 and 2025. In such an instance, the Utility could be required to record a charge for the remaining amount of its unrecovered investment and such charge could have a material effect on PG&E Corporation and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, in order to retain highly skilled personnel necessary to safely operate Diablo Canyon during the remaining years of operations, the Utility will incur costs in connection with (i) an employee retention program to ensure adequate staffing levels at Diablo Canyon, and (ii) an employee retraining and development program, to facilitate redeployment of a portion of Diablo Canyon personnel to the decommissioning project and elsewhere in the company. In its January 11, 2018 decision, the CPUC authorized rate recovery up to $211.3 million (compared with the $352.1 million requested by the Utility) for an employee retention program, but there can be no assurance that the Utility will be successful in retaining highly skilled personnel under such program. The Utility has incurred, and may continue to incur, substantial costs to comply with NRC regulations and orders. (See “Regulatory Environment” in Item 1. Business.) If the Utility were unable to recover these costs, PG&E Corporation’s and the Utility’s financial results could be materially affected. The Utility may determine that it cannot comply with the new regulations or orders in a feasible and economic manner and voluntarily cease operations; alternatively, the NRC may order the Utility to cease operations until the Utility can comply with new regulations, orders, or decisions. The Utility may incur a material charge if it ceases operations at Diablo Canyon’s two nuclear generation units before their respective licenses expire in 2024 and 2025. At December 31, 2017, the Utility’s unrecovered investment in Diablo Canyon was $1.7 billion. On June 28, 2016 the California State Lands Commission approved an extension of the Utility’s leases of coastal land occupied by the water intake and discharge structures for the nuclear generation units at Diablo Canyon, to run concurrently with Diablo Canyon’s current operating licenses. The Utility will be required to obtain an additional lease extension from the State Lands Commission to cover the period of time necessary to decommission the facility. The State Lands Commission and California Coastal Commission will evaluate appropriate environmental mitigation and development conditions associated with the decommissioning project, the costs of which could be substantial. The Utility also has an obligation to decommission its electricity generation facilities, including its nuclear facilities, as well as gas transmission system assets, at the end of their useful lives. (See Note 2: Summary of Significant Accounting Policies - Asset Retirement Obligations of the Notes to the Consolidated Financial Statement in Item 8.) The CPUC authorizes the Utility to recover its estimated costs to decommission its nuclear facilities through nuclear decommissioning charges that are collected from customers and held in nuclear decommissioning trusts to be used for the eventual decommissioning of each nuclear unit. If the Utility’s actual decommissioning costs, including the amounts held in the nuclear decommissioning trusts, exceed estimated costs, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility purchases its nuclear fuel assemblies from a sole source, Westinghouse. If Westinghouse experiences business disruptions as a result of Chapter 11 proceedings or its pending acquisition by Brookfield, the Utility could experience disruptions in nuclear fuel supply, and delays in connection with its Diablo Canyon outages and refuelings. The Utility purchases its nuclear fuel assemblies for Diablo Canyon from a sole source, Westinghouse. The Utility also stores nuclear fuel inventory at the Westinghouse fuel fabrication facility. In addition, Westinghouse provides the Utility with Diablo Canyon outage support services, nuclear fuel analysis, original equipment manufacturer engineering and parts support. On March 29, 2017, Westinghouse filed for Chapter 11 protection in the United States Bankruptcy Court, Southern District of New York. On January 4, 2018, Westinghouse announced that it has agreed to be acquired by Brookfield Business Partners L.P. Westinghouse also indicated that its acquisition by Brookfield is expected to close in the third quarter of 2018, subject to Bankruptcy Court approval and customary closing conditions including, among others, regulatory approvals. In the event that Westinghouse experiences business disruptions in its nuclear fuel business as a result of bankruptcy proceedings, its pending acquisition by Brookfield, or otherwise, the Utility could experience issues with its nuclear fuel supply and delays in connection with Diablo Canyon refueling outages. Diablo Canyon’s Unit 2 refueling outage will occur in the first quarter of 2018 and the required fuel for that outage has been delivered. The next Unit 1 refueling outage is expected to occur in the first quarter of 2019 and the fuel for that outage has not yet been fabricated. If Westinghouse were to fail to deliver nuclear fuel or provide outage support to the Utility, the Utility’s operation of Diablo Canyon would be adversely affected. PG&E Corporation and the Utility also could experience additional costs, including decreased electricity market revenues, in the event that one or both Diablo Canyon units are unable to operate. There can be no assurance that any such additional costs would be recoverable in the rates the Utility is permitted to recover from its customers. Furthermore, the Utility currently is not able to estimate the nature or amount of additional costs and expenses that it might incur in connection with the uncertainties surrounding Westinghouse but such costs and expenses could be material. For certain critical technologies, products and services, the Utility relies on a limited number of suppliers and, in some cases, sole suppliers. In the event these suppliers are unable to perform, the Utility could experience delays and disruptions in its operations while it transitions to alternative plans or suppliers. The Utility relies on a limited number of sole source suppliers for certain of its technologies, products and services. Although the Utility has long-term agreements with such suppliers, if the suppliers are unable to deliver these technologies, products or services, the Utility could experience delays and disruptions while it implements alternative plans and makes arrangements with acceptable substitute suppliers. As a result, the Utility’s business, financial condition, and results of operations could be significantly affected. As an example, the Utility relies on Silver Spring Networks, Inc. and Aclara Technologies LLC as suppliers of proprietary SmartMeter™ devices and software, and of managed services, utilized in its advanced metering system that collects electric and natural gas usage data from customers. If these suppliers encounter performance difficulties or are unable to supply these devices or maintain and update their software, or provide other services to maintain these systems, the Utility’s metering, billing, and electric network operations could be impacted and disrupted. Risks Related to Environmental Factors Severe weather conditions, extended drought and shifting climate patterns could materially affect PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, and cash flows. Extreme weather, extended drought and shifting climate patterns have intensified the challenges associated with wildfire management in California. Environmental extremes, such as drought conditions followed by periods of wet weather, can drive additional vegetation growth (which then fuel any fires) and influence both the likelihood and severity of extraordinary wildfire events. In California, over the past five years, inconsistent and extreme precipitation, coupled with more hot summer days, have increased the wildfire risk and made wildfire outbreaks increasingly difficult to manage. In particular, the risk posed by wildfires has increased in the Utility’s service area (the Utility has approximately 82,000 distribution overhead circuit miles and 18,000 transmission overhead circuit miles) as a result of an extended period of drought, bark beetle infestations in the California forest and wildfire fuel increases due to record rainfall following the drought, among other environmental factors. Other contributing factors include local land use policies and historical forestry management practices. The combined effects of extreme weather and climate change also impact this risk. Severe weather events, including wildfires and other fires, storms, tornadoes, floods, drought, earthquakes, tsunamis, pandemics, solar events, electromagnetic events, or other natural disasters such as wildfires, could result in severe business disruptions, prolonged power outages, property damage, injuries or loss of life, significant decreases in revenues and earnings, and/or significant additional costs to PG&E Corporation and the Utility. Any such event could have a material effect on PG&E Corporation’s and the Utility’s business, financial condition, results of operations, liquidity, and cash flows. If the Utility is unable to recover its wildfire costs, due to the reasons described in the risk factors related to the Northern California fires, Butte fire, the doctrine of inverse condemnation, and insurance limitations above, or for other reasons, its financial condition, results of operations, liquidity, and cash flows could be materially affected. Further, the Utility has been studying the potential effects of climate change (increased temperatures, changing precipitation patterns, rising sea levels) on the Utility’s operations and is developing contingency plans to adapt to those events and conditions that the Utility believes are most significant. Scientists project that climate change will increase electricity demand due to more extreme, persistent and hot weather. As a result, the Utility’s hydroelectric generation could change and the Utility would need to consider managing or acquiring additional generation. If the Utility increases its reliance on conventional generation resources to replace hydroelectric generation and to meet increased customer demand, it may become more costly for the Utility to comply with GHG emissions limits. In addition, flooding caused by rising sea levels could damage the Utility’s facilities, including generation and electric transmission and distribution assets. The Utility could incur substantial costs to repair or replace facilities, restore service, or compensate customers and other third parties for damages or injuries. The Utility anticipates that the increased costs would be recovered through rates, but as rate pressures increase, the likelihood of disallowance or non-recovery may increase. Events or conditions caused by climate change could have a greater impact on the Utility’s operations than the Utility’s studies suggest and could result in lower revenues or increased expenses, or both. If the CPUC fails to adjust the Utility’s rates to reflect the impact of events or conditions caused by climate change, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility’s operations are subject to extensive environmental laws and changes in or liabilities under these laws could adversely affect PG&E Corporation’s and the Utility’s financial results. The Utility’s operations are subject to extensive federal, state, and local environmental laws, regulations, and orders, relating to air quality, water quality and usage, remediation of hazardous wastes, and the protection and conservation of natural resources and wildlife. The Utility incurs significant capital, operating, and other costs associated with compliance with these environmental statutes, rules, and regulations. The Utility has been in the past, and may be in the future, required to pay for environmental remediation costs at sites where it is identified as a potentially responsible party under federal and state environmental laws. Although the Utility has recorded liabilities for known environmental obligations, these costs can be difficult to estimate due to uncertainties about the extent of contamination, remediation alternatives, the applicable remediation levels, and the financial ability of other potentially responsible parties. (For more information, see Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) Environmental remediation costs could increase in the future as a result of new legislation, the current trend toward more stringent standards, and stricter and more expansive application of existing environmental regulations. Failure to comply with these laws and regulations, or failure to comply with the terms of licenses or permits issued by environmental or regulatory agencies, could expose the Utility to claims by third parties or the imposition of civil or criminal fines or other sanctions. The CPUC has authorized the Utility to recover its environmental remediation costs for certain sites through various ratemaking mechanisms. One of these mechanisms allows the Utility rate recovery for 90% of its hazardous substance remediation costs for certain approved sites without a reasonableness review. The CPUC may discontinue or change these ratemaking mechanisms in the future or the Utility may incur environmental costs that exceed amounts the CPUC has authorized the Utility to recover in rates. Some of the Utility’s environmental costs, such as the remediation costs associated with the Hinkley natural gas compressor site, are not recoverable through rates or insurance. (See “Environmental Regulation” in Item 1. and Note 13 of the Notes to the Consolidated Financial Statements in Item 8.) The Utility’s costs to remediate groundwater contamination near the Hinkley natural gas compressor site and to abate the effects of the contamination have had, and may continue to have, a material effect on PG&E Corporation’s and the Utility’s financial results. Their financial results also can be materially affected by changes in estimated costs and by the extent to which actual remediation costs differ from recorded liabilities. State climate policy requires reductions in greenhouse gases of 40% by 2030 and 80% by 2050. Various proposals for addressing these reductions have the potential to reduce natural gas usage and increase natural gas costs. The future recovery of the increased costs associated with compliance is uncertain. The CARB is the state’s primary regulator for GHG emission reduction programs. Natural gas providers have been subject to compliance with CARB’s Cap-and-Trade Program since 2015, and natural gas end-use customers have an increasing exposure to carbon costs under the Program through 2030 when the full cost will be reflected in customer bills. CARB’s Scoping Plan also proposes various methods of reducing GHG emissions from natural gas. These include more aggressive energy efficiency programs to reduce natural gas end use, increased renewable portfolio standards generation in the electric sector reducing noncore gas load, and replacement of natural gas appliances with electric appliances, leading to further reduced demand. These natural gas load reductions may be partially offset by CARB’s proposals to deploy natural gas to replace wood fuel in home heating and diesel in transportation applications. CARB also proposes a displacement of some conventional natural gas with above-market renewable natural gas. The combination of reduced load and increased costs could result in higher natural gas customer bills and a potential mandate to deliver renewable natural gas could lead to cost recovery risk. Other Risk Factors The Utility may be required to incur substantial costs in order to obtain or renew licenses and permits needed to operate the Utility’s business and the Utility may be subject to fines and penalties for failure to comply or obtain license renewal. The Utility must comply with the terms of various governmental permits, authorizations, and licenses, including those issued by the FERC for the continued operation of the Utility’s hydroelectric generation facilities, and those issued by environmental and other federal, state and local governmental agencies. Many of the Utility’s capital investment projects, and some maintenance activities, often require the Utility to obtain land use, construction, environmental, or other governmental permits. These permits, authorizations, and licenses may be difficult to obtain on a timely basis, causing work delays. Further, existing permits and licenses could be revoked or modified by the agencies that granted them if facts develop that differ significantly from the facts assumed when they were issued. In addition, the Utility often seeks periodic renewal of a license or permit, such as a waste discharge permit or a FERC operating license for a hydroelectric generation facility. If a license or permit is not renewed for a particular facility and the Utility is required to cease operations at that facility, the Utility could incur an impairment charge or other costs. Before renewing a permit or license, the issuing agency may impose additional requirements that may increase the Utility’s compliance costs. In particular, in connection with a license renewal for one or more of the Utility’s hydroelectric generation facilities or assets, the FERC may impose new license conditions that could, among other things, require increased expenditures or result in reduced electricity output and/or capacity at the facility. In addition, local governments may attempt to assert jurisdiction over various utility operations by requiring permits or other approvals that the Utility has not been previously required to obtain. The Utility may incur penalties and sanctions for failure to comply with the terms and conditions of licenses and permits which could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. If the Utility cannot obtain, renew, or comply with necessary governmental permits, authorizations, licenses, ordinances, or other requirements, or if the Utility cannot recover the increase in associated compliance and other costs in a timely manner, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Poor investment performance or other factors could require PG&E Corporation and the Utility to make significant unplanned contributions to its pension plan, other postretirement benefits plans, and nuclear decommissioning trusts. PG&E Corporation and the Utility provide defined benefit pension plans and other postretirement benefits for eligible employees and retirees. The Utility also maintains three trusts for the purposes of providing funds to decommission its nuclear facilities. The performance of the debt and equity markets affects the value of plan assets and trust assets. A decline in the market value may increase the funding requirements for these plans and trusts. The cost of providing pension and other postretirement benefits is also affected by other factors, including interest rates used to measure the required minimum funding levels, the rate of return on plan assets, employee demographics, discount rates used in determining future benefit obligations, rates of increase in health care costs, future government regulation, and prior contributions to the plans. Similarly, funding requirements for the nuclear decommissioning trusts are affected by the rates of return on trust assets, changes in the laws or regulations regarding nuclear decommissioning or decommissioning funding requirements as well as changes in assumptions or forecasts related to decommissioning dates, technology and the cost of labor, materials and equipment. (See Note 2: Summary of Significant Accounting Policies of the Notes to the Consolidated Financial Statements in Item 8.) If the Utility is required to make significant unplanned contributions to fund the pension and postretirement plans or if actual nuclear decommissioning costs exceed the amount of nuclear decommissioning trust funds and the Utility is unable to recover the contributions or additional costs in rates, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility’s success depends on the availability of the services of a qualified workforce and its ability to maintain satisfactory collective bargaining agreements which cover a substantial number of employees. PG&E Corporation’s and the Utility’s results may suffer if the Utility is unable to attract and retain qualified personnel and senior management talent, or if prolonged labor disruptions occur. The Utility’s workforce is aging and many employees are or will become eligible to retire within the next few years. Although the Utility has undertaken efforts to recruit and train new field service personnel, the Utility may be faced with a shortage of experienced and qualified personnel. The majority of the Utility’s employees are covered by collective bargaining agreements with three unions. Labor disruptions could occur depending on the outcome of negotiations to renew the terms of these agreements with the unions or if tentative new agreements are not ratified by their members. In addition, some of the remaining non-represented Utility employees could join one of these unions in the future. PG&E Corporation and the Utility also may face challenges in attracting and retaining senior management talent especially if they are unable to restore the reputational harm generated by the negative publicity stemming from the ongoing enforcement proceedings. Any such occurrences could negatively impact PG&E Corporation’s and the Utility’s financial condition and results of operations. The Utility’s business activities are concentrated in one region, as a result of which, its future performance may be affected by events and factors unique to California. The Utility’s business activities are concentrated in Northern California. As a result, the Utility’s future performance may be affected by events and economic factors unique to California or by regional regulation or legislation, for example the doctrine of inverse condemnation. (See “The doctrine of inverse condemnation, if applied by courts in litigation to which PG&E Corporation and the Utility are subject, could significantly expand the potential liabilities from such litigation and materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows” above.) ITEM 1B.